Similar Projects
Bay Lake Professional Park
New Construction - 16,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Tampa, FL 33618

Boeing Cecil Airport Expansion
New Construction - 370,000 SF
Conception
$116,500,000 est. value
Jacksonville, FL 32221

Main Street Courts
New Construction, Build-Out - 39,456 SF
Design
$2,500,000 est. value
Davie, FL 33314

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

Design-Build Services for Jacksonville Fairground Relocation
New Construction, Renovation
Bidding
Jacksonville, FL 32260

HWO Border Patrol Building Demolition
Renovation, Demolition
Bidding
Pembroke Pines, FL 33023

Reach Estate Properties
New Construction - 3,833 SF
Post-Bid
$750,000 est. value
Loxahatchee, FL 33470

Clearwater Center
Renovation
Post-Bid
Clearwater, FL 33764

Shade Structure Design and Install
Term Contract
Results
Less than $320,000 est. value
Largo, FL 33779

Hockey Rink (Outdoor)
Results
Hurlburt Field, FL 32544

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Miami River
New Construction - 3,678,706 SF
Construction
Less than $310,000,000 est. value
Miami, FL

Heritage Insurance
Build-Out - 88,643 SF
Pending Verification
Tampa, FL 33607

Avalon Apartments
New Construction
Pending Verification
Largo, FL 33778

Midtown Place at Boca Raton
New Construction - 120,000 SF
Conception
$10,000,000 CJ est. value
Boca Raton, FL 33486

Reported 03/02/2022 12:00 AM
Project Title

Cannery Park Building Renovation

Physical Address View project details and contacts
City, State (County) Saint Cloud, FL 34769   (Osceola County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Misc. Recreational, Office
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $970,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The renovation of the Cannery Park building will provide common rental space for the community and additional office space for the Parks and Recreation department. The building will be rehabilitated, mechanical, plumbing as well as electrical will be updated. The project will include the improvement of the surrounding landscaping, sidewalks and public bathrooms.

Details

Office, Renovation, Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents