Similar Projects
Upcoming: Ballistic Windows
Alteration
Design
San Jose, CA

Upcoming - Sleeve Valve
Term Contract, Alteration
Design
San Jose, CA

Citywide as-Needed Repair Services
New Construction
Post-Bid
$10,000,000 CJ est. value
Santa Clara, CA

Site Maintenance Services
Alteration
Post-Bid
Less than $250,000 est. value
CA

General Building (B License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
New Construction, Renovation
Results
$5,000,000 est. value

Digester Cleaning and Equipment Services
Alteration
Results
San Jose, CA

Handyman Service
Alteration
Post-Bid

HVAC and Refrigeration System Repairs
Alteration
Results
$200,000 est. value
CA

Parking Lot Steam Cleaning - Gilroy Cvef Northbound And Southbound
Term Contract
Post-Bid
San Martin, CA

Whole Structure Fumigation
Term Contract
Results

Rentals Portable Restrooms and Hand Washing Stations
Term Contract
Post-Bid
San Jose, CA

Citywide Pest Control Services
Term Contract
Post-Bid
Santa Clara, CA 95050

Fire Life Safety System Repairs
Term Contract
Post-Bid
$200,000 est. value
CA

Graphic Design Services
Term Contract
Post-Bid
San Jose, CA

Ada Improvements To Elmwood Barracks 2
Term Contract
Post-Bid
$110,602,700 est. value
Milpitas, Santa Clara, CA 95035

Reported 07/21/2022 12:00 AM
Project Title

Gas Distribution System Leak Survey for a Period of 6 (Six) Years

Physical Address View project details and contacts
City, State (County) Palo Alto, CA   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this request is to secure a Professional Services contract with a qualified Consultant to conduct mobile and walking natural gas (methane) leak surveys of the City of Palo Alto Utilities gas distribution system (mains, services and meters). The leakage surveys shall be in compliance with the Department of Transportation Code of Federal Regulations, Title 49, Part 192 & Part 199 minimum safety regulations and the Utilities Department Operations & Maintenance Manual. The term of this contract is expected to be for six years.

Details

Division 33 - Utilities, Natural-Gas Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents