Similar Projects
Phase 1 West Lynn Sewer Separation Construction Project
Bidding
Less than $15,500,000 est. value
Lynn, MA

Wastewater Facilities Improvements Comprehensive Sewer System Rehabilitation - CO-01-2
Bidding
Less than $500,000 est. value
Danvers, MA 01923

Sewer Interceptor Joint Grout Sealing
Post-Bid
Less than $80,000 est. value
North Andover, MA

Drain Cleaning Services
Term Contract
Post-Bid
Less than $25,000 est. value
Methuen, MA

Subsystem W Rehabilitation
Results
Less than $3,100,000 est. value
Beverly, MA

Catch Basin and Manhole Castings
Term Contract
Results
Less than $439,900 est. value
Beverly, MA

Route 1 Sewer Expansion Project
Bidding
Salisbury, MA

CCTV Pipeline Inspection and Jet/Vacuum Cleaning
Term Contract
Post-Bid
$100,000 est. value
Salem, MA

Various Sewer Manhole, Drain Manhole or Catch Basin Repairs
Results
Less than $25,000 est. value
Saugus, MA

Manhole Casting Adjustment
Post-Bid
Less than $300,000 est. value
Methuen, MA

Utility Construction Services as Needed
Results
Saugus, MA

Extraction of 400 Catch Basins Using Clamshell Bucket or Orange-Peel Bucket
Post-Bid
Byfield, MA 01922

West Street Sewer Replacement
Results
Lawrence, MA

Sewer Drain and Catch Basin Structures
Term Contract
Post-Bid
Less than $169,000 est. value
Andover, MA

2019 Sewer Rehabilitation Project
Results
Less than $500,000 est. value
Gloucester, MA 01930

Reported 05/23/2019 12:00 AM
Project Title

Catchbasin Cleaning - Clamshell and Vacuum

Physical Address View project details and contacts
City, State (County) Salem, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from Municipal Agency - 05/01/19
Owner View project details and contacts
Architect View project details and contacts
Description Contract Period: The Contract will terminate on June 30, 2020 at which time the City of Salem may elect to renew the Contract for an additional two years, in one year increments, at its sole discretion. Each Catchbasin is to be thoroughly cleaned of sand, silt, and debris from the lower portion of the basin (i.e. basin sump) and gutter mouth of curb inlets by mechanical means or hand labor. Jetting or rodding may be required to loosen debris materials to assure complete removal. A basin which cannot be cleaned due to a structural defect or absence of a sump will not be measured for payment. C. The catchbasin shall be considered clean when remaining material in the catchbasin is not more than four (4) inches in depth, if leveled. The City will conduct a performance evaluation at a minimum of forty (40) catchbasins or two (2) percent of the number cleaned, whichever is greater. Basins not satisfactorily cleaned will be brought to the Contractor’s attention and re-cleaned at no additional cost. The City reserves the right to order the Contractor to re-clean all of the catchbasins at no additional cost if more than fifty (50) percent of the catchbasins examined during the performance evaluation are not considered clean. In the event an order to re-clean all of the catchbasins is given it will be done under DPW personnel oversight and subject to liquidated damages.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents