Similar Projects
2020 Sanitary Sewer Cleaning and CCTV Investigation
Results
Clinton Township, MI

2020 Sanitary Sewer Cleaning and CCTV Investigation - Contract 2
Results
Clinton Township, MI

Romeo Arm Interceptor Segment 5 Lining
Results
Fraser, Sterling Heights, MI

Water and Sewer Supply Parts
Term Contract
Results
Warren, MI

Stilwell Manor Improvements-Phase 2
Results
Warren, MI

2020-2021 Sewer and Water Repair Supplies and Water Meters Contract
Term Contract
Results
Saint Clair Shores, MI 48081

Sanitary Collection System Flow Meters Project
Results
Less than $344,680 est. value
Warren, MI 48093

Sewer Rehabilitation C.I.P.P. Lining
Results
Less than $191,000 est. value
Chesterfield, MI 48047

2020 Sanitary Sewer Rehabilitation by Open Cut Repairs
Results
Less than $155,200 est. value
Chesterfield, MI 48047

WWTP Sanitary Sewer Retention Basin Cleaning
Results
Warren, MI 48093

2020 Sanitary Sewer Repairs
Results
Less than $264,192 est. value
Warren, MI 48093

2020 Sanitary Sewer Rehabilitation - CIPP Lining
Results
Saint Clair Shores, MI 48081

Storm Drain and Sanitary Sewer Repairs
Results
Sterling Heights, MI

2020 Sewer Repairs
Results
Less than $155,300 est. value
Roseville, Saint Clair Shores, MI 48066

Metering Facility Rehabilitation Project
Results
Macomb, MI

Last Updated 09/22/2021 03:25 PM
Project Title

2021 Sanitary Sewer Rehabilitation by Full Length CIPP Lining

Physical Address View project details and contacts
City, State (County) Macomb, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Contract includes all the work required to reconstruct the existing sanitary sewers indicated on the plan by the installation of Full Length (CIPP) liner and to prepare a report of all pertinent information to be submitted to the Owner before final acceptance. Preparatory work and cleaning shall be performed on all proposed lines. All CCTV Inspections shall be performed by National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) standards. The sewer line sections, during pre and post CIPP operations, shall be visually inspected by means of pan and tilt closed-circuit television camera. The inspection will be done on one sewer at a time and the flow in the section being inspected will be suitably controlled as necessary.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents