Similar Projects
Recreation Center-Eastside RDA -MF484 - City of Henderson
New Construction, Infrastructure
Conception
$67,064,700 CJ est. value
Henderson, NV 89015

Floyd Lamb Park Haybarn Building - City of Las Vegas
Renovation
Conception
$259,452 CJ est. value
Las Vegas, NV 89131

Boulevard South Apartments
New Construction, Infrastructure - 920,371 SF
Design
$150,000,000 CJ est. value
Las Vegas, NV 89044

Henderson Star
New Construction, Infrastructure - 413,829 SF
Design
$100,000,000 CJ est. value
Henderson, NV 89011

Veterans Memorial Restroom Remodel
Renovation
Bidding
$1,100,000 CJ est. value
Las Vegas, NV 89144

RFP Construction Management at Risk (CMAR) - Centennial Hills Indoor and Outdoor Pool and Building Improvements
Renovation, Infrastructure
Bidding
$9,500,000 CJ est. value
Las Vegas, NV 89131

Park Camino Apartments - Phase 2
New Construction, Infrastructure
Post-Bid
$70,000,000 CJ est. value
North Las Vegas, NV 89032

Civic Center Building and Plaza
Demolition, New Construction, Infrastructure - 240,000 SF
Post-Bid
$165,000,000 CJ est. value
Las Vegas, NV 89101

Doolittle Active Adult Center Remodel
Build-out
Results
$1,440,700 CJ est. value
Las Vegas, NV 89106

LVB Neal Apartments
New Construction
Construction
Las Vegas, NV 89183

Henderson 30
New Construction, Infrastructure
Pending Verification
$145,000,000 CJ est. value
Henderson, NV 89015

Craig & Allen Apartments
New Construction - 2,425 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
North Las Vegas, NV 89032

Community Centers Portable Generators - City of Las Vegas
Renovation
Conception
$600,000 CJ est. value
Las Vegas, NV 89101

Old City Hall/Community Center - 25032 - City of North Las Vegas
New Construction, Infrastructure
Design
$8,296,822 CJ est. value
North Las Vegas, NV 89030

Atari Hotel / Las Vegas
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Las Vegas, NV 89101

Last Updated 09/12/2023 04:36 AM
Project Title

Durango Hills Central Plant Replacement

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89129   (Clark County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,525,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Las Vegas (Owner) hereby invites qualified firms or individuals (Bidders) to submit Bids for mechanical, plumbing and electrical equipment upgrades at the central plant. Work of the Project includes mechanical, plumbing and electrical equipment upgrades Question Deadline: 09/05/2023 at 8:00 PM PT Estimate: $1,450,000 - $1,525,000 Bid Bond or, at the option of the Bidder, may be in the form of a cashier's check, certified check or money order provided the instrument is issued in the name of the City of Las Vegas as the payee, the Performance Bond, Labor and Material Payment Bond and the Guaranty Bond, attached, required. A business that is at least fifty-one percent (51%) minority-owned, operated and actively controlled by one or more minorities. In the case of a publicly owned business, at least fifty-one percent (51%) of the stock must be minority-owned and the business must be operated and actively controlled by a minority. A business that is at least fifty-one percent (51%) disabled veteran-owned, operated and actively controlled by one or more disabled veterans, or in the case of a publicly owned business, at least fifty-one percent (51%) of the stock must be owned and the business operated and actively controlled by a disabled veteran. The City reserves the right to waive any minor informality or irregularity in any Bid submission, and to correct technical, data entry or computation errors. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document ~ $1,450,000 - $1,525,000 COMPLETION DEADLINE Bidder acknowledges all Work on the project must be completed within 90 calendar days of Notice to Proceed date.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents