Similar Projects
DFCM Construction-Standard Low Bid-SUU JL Sorenson PE Bldg. Locker Room Safety/Code Upgrade
Renovation
Bidding
$386,392 est. value
Cedar City, UT

Discover Restroom Refresh
Renovation
Post-Bid
Salt Lake City, UT 84120

Construction of a Complete Restroom Building
Post-Bid
Hyde Park, UT 84318

Z--(S) (660) Rest Room Restoration (Va-19-00020667)
Renovation - 5,019 SF
Results
$25,000 to $100,000 est. value
Salt Lake City, UT 84148

Copperview Recreation Center Restrooms Remodel
Renovation
Results
$250,000 to $300,000 est. value
Midvale, UT 84047

Costco Dry Depot Additon #594
Addition - 56,700 SF
Construction
$4,300,000 est. value
Salt Lake City, UT 84104

Family History Library Main Level Restroom
Renovation - 27,263 SF
Construction
$300,000 est. value
Salt Lake City, UT 84150

Riverton Spa
New Construction - 6,479 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Riverton, UT 84065

Vault Toilets Zion National Park
New Construction
Post-Bid
$250,000 to $500,000 est. value

Swiss Pioneer Memorial Park
Results
Less than $495,000 est. value
Santa Clara, UT 84765

DFCM Construction-Bear Lake SP Rendezvous Beach Restroom Improvement
Construction
$1,200,000 est. value
Laketown, UT 84038

Beaver, Hampton Ford Ward Restroom Remodel
Renovation - 112 SF
Post-Bid
Logan, UT 84306

Independence Plat K Park - Restroom
Results
Bluffdale, UT 84065

Fairgrounds Restrooms Project
Post-Bid
UT

DFCM Construction-UDOT Bear Lake Rest Area Improvements
New Construction
Results
$850,000 est. value
Laketown, UT

Reported 12/05/2019 10:25 AM
Project Title

Camp Williams Buildings 4101/4141 Restrooms Remodel

Physical Address View project details and contacts
City, State (County) Riverton, UT   (Salt Lake County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method
Project Status Construction Commenced October 2019
Bids Due View project details and contacts
Estimated Value Less than $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is to remodel two adjacent restroom buildings which are attached to housing quarters. These restrooms serve as restroom facilities for troops returning from field exercises who will temporarily be housed in the temporary housing units at each building. Construction Cost Estimate – Building 4101: $400,000 Construction Cost Estimate – Building 4141: $400,000.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents