Similar Projects
Pedestrian Tunnel Renewal Phase 3
Renovation
Bidding
$355,000 est. value
Dayton, OH 45431

Pedestrian Tunnel Renewal Phase 3
Renovation
Bidding
$355,000 est. value
Dayton, OH 45431

Lower Olentangy Tunnel
Post-Bid
Columbus, OH 43215

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Senecaville Dam Concrete and Brick Repair
Results
Senecaville, OH 43780

2020 Pedestrian Tunnel Maintenance - Carnoustie Drive North of Aryshire Drive
Results
Dublin, OH 43016

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

CAM Upstream Main Crossover Seal Repair
Results
$25,000 to $100,000 est. value
Felicity, OH 45120

Muskingum River Parkway Lock & Dam Irrms
Renovation
Post-Bid
$13,400,000 est. value

Upper and Lower Lake Dam Rehabilitations Phase II
Results
Richfield, OH 44286

Statewide Dam Improvements
New Construction
Post-Bid
$24,800,000 est. value

Ccp Infrastructure - Ridge Tunnel Repairs
Results
Less than $3,190,249 est. value
Bowling Green, OH

WIO Culvert Valve Bulkhead Repairs
Term Contract
Post-Bid
Newport, OH 45768

Easterly Tunnel System Improvements
Results
Less than $506,600 est. value
Cleveland, OH

Lower Shaker Lake Spillway Repair
Results
$104,423 est. value
Shaker Heights, OH 44120

Reported 03/26/2022 12:00 AM
Project Title

Tunnel System Evaluation - Bid package 1

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $435,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of temporary structural supports within the 19th Avenue Tunnel and the Cockins Hall Vault. The project will also remove and replace piping within the Cockins Hall Vault, remove abandoned utilities within the 19th Avenue Tunnel, and re-rack existing communications cabling within the 19th Avenue Tunnel. Temporary lighting will also be installed in the 19th Avenue Tunnel.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents