Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

Garfield Harrison Storm Drainage Improvements Project
Bidding
Loveland, CO

Sugarloaf Retaining Walls at SH-119
Bidding
Boulder, CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Las Vegas Street Culvert at Colony Hills Channel
Results
Less than $1,000,000 est. value
Colorado Springs, CO 80903

Clear Spring Ranch Facility Drainage Improvements
Alteration
Bidding
Colorado Springs, CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Slip line and Extend Culvert
Infrastructure
Bidding
Less than $1,000,000 est. value

Detention Pond Improvements
Post-Bid
Golden, CO

Savanna 5th Subdivision Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Loveland, CO 80537

Black Squirrel Creek Drainage Improvements
Infrastructure
Bidding
Colorado Springs, CO

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Reported 05/20/2021 12:00 AM
Project Title

2021 Red Mountain Road Retaining Wall Repair Project

Physical Address View project details and contacts
City, State (County) Aspen, CO 81612   (Pitkin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repair work to a retaining wall located on Red Mountain Road in Aspen, CO. Responsible proposers should provide information regarding qualifications, references, approach, and similar services as detailed in the RFP packet. A traffic control plan is required as a part of this project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents