Similar Projects
Recreation Complex Tennis Courts and Restroom Construction
New Construction
Bidding
Fort Mill, SC 29715

Holiday Inn Club Vacation Ocean Front
New Construction - 452,034 SF
Post-Bid
$10,000,000 CJ est. value
Myrtle Beach, SC

Northside Baseball Complex Restroom Construction
Post-Bid
Florence, SC 29506

SCDMV - Restroom ADA Renovations - Saluda
Renovation - 1,911 SF
Results
$80,000 to $95,000 est. value
Saluda, SC 29138

Cordillo Courts Restroom and Parking Project
Results
Less than $188,000 est. value
Hilton Head Island, SC 29928

The Landings at Grande Dunes
New Construction
Construction
Myrtle Beach, SC

Love's Travel Stop Shower and Laundry Addition
Addition - 1,350 SF
Construction
Fair Play, SC 29643

Clemson Bathhouse
New Construction - 5,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Clemson, SC

Bathroom Modification
Results
Less than $20,000 est. value
Aiken, SC

Maple and Mcleod Parks Restroom Renovations
Renovation
Post-Bid
Florence, SC 29501

Bathroom Modification
Results
Less than $20,000 est. value
Bath, SC

Design and Construction for Public Restroom Facility Wilson Hill and Chestnut Street Park
New Construction
Post-Bid
Abbeville, SC 29620

Bathroom Modification
Results
Less than $20,000 est. value
Warrenville, SC

Outdoor Restrooms
New Construction
Post-Bid
Conway, SC

Bathroom Modification
Results
Less than $20,000 est. value
Blythewood, SC

Reported 03/21/2022 09:18 AM
Project Title

Dawson Park Bathroom Facility

Physical Address View project details and contacts
City, State (County) Clemson, SC 29631   (Pickens County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Professional qualified contractor for providing all the necessary tasks, including all material and supplies for the construction of a bathroom facility at Dawson Park. The project consists of the following: Design-Build services for a Park Restroom Facility with Shelter space in compliance with current building and fire code requirements of the City of Clemson and Pickens County and all ADA requirements. Dawson Park Restroom Facility will include 2 separate restrooms with two toilets with stalls in each restroom, a sink, a hose bib, a hand dryer, and GFI’s. Each restroom will be approximately 9’ X 9’ with a plumbing chase in between rooms. Each restroom will need to be heated to prevent pipe burst. The roof will be approximately 30’ X 30’ to cover the restrooms and provide a shelter area. The flooring will be a finished concrete.

Details

Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents