Similar Projects
Airfield Guidance Signage
Bidding
Mesa, AZ

Construct Wrong Way Signs and Marking
Bidding
$798,000 est. value

Guardrail Installation
Post-Bid
AZ

Traffic Control Supplies & Equipment
Post-Bid
Phoenix, AZ 85001

R--Message Billboards; Fire Prevention
Results
Anthem, Bisbee, Black Canyon City, Kingman, New River, Pima, Prescott, Safford, Sonoita, Thatcher, Tombstone, Yarnell, AZ

R--Message Billboards; Fire Prevention
Results
Anthem, Bisbee, Black Canyon City, Kingman, New River, Pima, Prescott, Safford, Sonoita, Thatcher, Tombstone, Yarnell, AZ

Guardrail (FY 2020-2021)
Bidding
Less than $184,270 est. value
Prescott, AZ

Student Success District Signage and Graphics
Post-Bid
Tucson, AZ 85721

City Entry Sign Construction
Results
Show Low, AZ 85901

Grand Canyon Logo Sign Program, Sign Installation/Removal Services
Term Contract
Bidding
Grand Canyon, AZ

Reflective Bike Lane Green Preformed Thermoplastic Pavement Marking Materials
Term Contract
Post-Bid
Phoenix, AZ 85003

Signage Events and Stadium
Results
Surprise, AZ 85374

On-Call Guardrail Repair and Replacement Services
Term Contract
Bidding
Phoenix, AZ

Annual Contract for Pavement Markings
Term Contract
Post-Bid
Holbrook, AZ 86025

Z--Repaint Highway Traffic Markings
Results
$25,000 to $100,000 est. value

Reported 11/19/2019 12:00 AM
Project Title

Fuel Pump Boot Dispenser Replacement

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

8(a) Set-Aside. The contractor shall perform the following tasks for replacing fuel dispenser penetration boots at facility 2446 at DMAFB. 1. Place barricades / fencing to secure 2 dispensers. Work will be phased and limited to 2 dispensers at a time. This will ensure a minimum of 4 dispensers (8 hoses) always available for customers. 2. Remove existing fuel dispensers from secured island. 3. Replace all penetration boots for the under-dispenser containment (UDC) pans and underground storage tanks (UST) sumps. 4. After replacement of penetration boots, contractor shall reinstall the existing fuel dispensers. 5. Perform hydrostatic tests on each UDC pan, UST sump, and all fuel lines. 6. After successful hydrostatic test, contractor shall re-start up the fuel dispensers. 7. Relocate barricades / fencing to secure the next 2 dispensers. Repeat steps 2-6. 8. Relocate barricades / fencing to secure the final 2 dispensers. Repeat steps 2-6.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents