Similar Projects
Hydroponic Lab Foundation and Plaza
Renovation, Infrastructure, Alteration
Bidding
$75,000 to $90,000 est. value
Hartsville, SC 29550

Edge Water
Infrastructure
Bidding
$300,000 to $400,000 est. value
Greenville, SC

Coward Water Imporvements-2019
Post-Bid
Coward, SC

Advanced Metering Infrastructure System
Post-Bid
West Columbia, SC

88 Connector Transmission Main
Results
Easley, SC 29642

Water Box and Lid for W and S Department - Annual Pricing
Term Contract
Results
Summerville, SC 29483

New Gray Rock Road Water Main Extension
Infrastructure
Bidding
$2,000,000 est. value
Tega Cay, SC 29708

5 Mueller Super Centurion 250 Fire Hydrants
Post-Bid
York, SC

I-20 Mineral Springs Force Main Relocate
Results
$50,000 est. value
Lexington, SC 29071

Calhoun Falls Campground Utilities
Infrastructure, Alteration
Bidding
$350,000 to $400,000 est. value
Calhoun Falls, SC 29628

South Magnolia Street Waterline Replacement
Post-Bid
Sumter, SC 29150

HDP Plastic Pipe for C-Fund Road Projects
Term Contract
Results
Orangeburg, SC

Fire Sprinkler and Backflow Systems - Preventive Maintenance, Repairs and Inspections
Infrastructure
Bidding
Columbia, SC

Palmetto Commerce Parkway Interchange Improvements Water Main Relocation
Post-Bid
Ladson, SC 29456

North Market Street Water Improvements
Results
Lancaster, SC

Reported 06/17/2022 12:00 AM
Project Title

Blatt Building - Replace Domestic Water Lines

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be bid as one project; however, it will constructed as two phases. Phase 1 (floors 4-5 plus required work above ceiling on 3rd floor) will begin Summer 2022, Phase 2 (floors 1-3) will begin Summer 2023. Replace plumbing pipes and fixtures, lighting and diffusers throughout. Replace rooftop exhaust uni. Replace bathroom partitions, install new ACT ceiling, and coat tile resinous/epoxy sealer. Demolition and reconstruction of some CMU shaft walls will be required.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents