Similar Projects
Z--Replace Water Control Structures 64 and 65
Design
Brigham City, UT 84302

Storm Water Improvement Projects
Bidding
$257,500 est. value
Riverdale, UT

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Purchase of Culverts
Post-Bid
Cedar City, UT 84720

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

500 East 600 South Design
Post-Bid
Salem, UT 84653

Hooper Slough Box Culvert Project
Results
$150,000 to $200,000 est. value
West Haven, UT 84401

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Arch Hydroseeding - Salt Wash Soil Stabilization and Revegetation
Results
Moab, UT 84532

Reported 04/24/2021 03:36 AM
Project Title

Drain Cleaning and Related Services

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACTOR shall: A. Comply with all Federal, State, and local legislations, rules, and regulations relating to the provision of services under the terms of a resulting contract. B. Meet all applicable industry standards, including disposal of hazardous waste. C. Be licensed in the State of Utah with no disciplinary actions. D. Respond within 24 hours after receiving call from UDC Coordinator/designee for regular drain service call (non-emergency). E. Respond within 2 hours or sooner for emergency service after receiving call from UDC Coordinator/designee. UDC Coordinator/designee will request emergency service when placing service call. F. Perform auger service to unclog drains. G. Provide UDC Coordinator/designee with a quote for using the jetter, if the clog cannot be unplugged with an auger. UDC Coordinator/designee mustsign the quote giving CONTRACTOR permission to use the jetter before the services are done. A copy of the signed quote must be provided with invoice for payment. H. Provide UDC with a Service Ticket of services performed, to include date of service, location, and time of service, to be signed by technician and UDC Coordinator/designee upon completion of service. I. Provide copy of the Service Ticket with invoice to UDC for payment. J. Be able to perform drain services, at the facilities listed below. K. Provide services Monday thru Friday, 8 a.m. to 5: 00 p.m. for regular services. L. Provide emergency services to include after hour services, weekends, and Holiday, as requested.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents