Similar Projects
ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

Road Improvement Project on the Sawtooth National Forest
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Stanley, ID 83278

I-90, SH-41 Interchange
Infrastructure
Bidding
ID

Hydrated Lime for Bunker Hill Central Treatment Plant
Infrastructure
Post-Bid
Kellogg, ID 83837

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

SFSR Overlay and Chip Seal project on the Payette National Forest
Alteration
Design
$1,000,000 to $5,000,000 est. value
McCall, ID 83638

Indian Creek Road Reconstruction
Infrastructure
Bidding
$300,000 est. value
Hailey, ID 83333

Buhl and Filer Highway Districts 2021 Crushing Project
Infrastructure
Post-Bid
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Baseline Road Reconstruction Elm Street to Center Street
Infrastructure
Bidding
Victor, ID 83455

Bids for Crushing Gravel
Infrastructure
Post-Bid
Jerome, ID 83338

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Reported 04/13/2022 11:08 AM
Project Title

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn

Physical Address View project details and contacts
City, State (County) ID   (Lemhi County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Paving/Reconstruction
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all labor, materials, tools, equipment, and supervision for project GAOA - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4CN located in Lemhi County, Idaho. The project is to surface with commercially sourced crushed aggregate, interior driveways and parking areas at six recreation sites along the Salmon River Road west of North Fork, Idaho.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents