Similar Projects
Orange Lake Associates RV Resort Park
New Construction, Infrastructure
Conception
Citra, FL

Fort King Middle School New Dining/Multi-Purpose Facility Conversion
Renovation, Addition
Conception
$5,900,000 est. value
Ocala, FL 34470

District Bar and Kitchen
New Construction
Design
Ocala, FL 34471

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Design
$300,000 CJ est. value
Ocala, FL 34475

Catalytic Opportunity Sites - 2021
New Construction
Bidding
Ocala, FL

Southwest 44th Avenue Extension Phase 1
Infrastructure
Bidding
$500,000 CJ est. value
Ocala, FL 34480

Marion County Public Schools - Central Warehouse
New Construction, Infrastructure - 60,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Ocala, FL 34479

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

KFC
New Construction - 2,200 SF
Post-Bid
$425,000 est. value
Ocala, FL 34475

North East 19th Ave Resurface (From NE 29th St to NE 35th St) 0.41 miles
Infrastructure
Results
$337,159 CJ est. value
Ocala, FL 34470

North East Highway 314A (CR 314A) Resurfacing (from E SR 40 to North East Highway 314)
Infrastructure
Results
$3,665,795 CJ est. value
Ocklawaha, FL 32179

Goldman Building - Shell
New Construction
Construction
Ocala, FL 34471

Wingstop - Y237
Renovation - 1,625 SF
Construction
$200,000 est. value
Ocala, FL 34474

Brewery in Midtown
Renovation
Pending Verification
Ocala, FL

SR 40 from CR 314 A to Levy Hammock Road - Florida Department of Transportation
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Woods and Lakes, FL 32179

Last Updated 09/13/2022 12:03 PM
Project Title

Culver's / Reddick

Physical Address View project details and contacts
City, State (County) Reddick, FL 32686   (Marion County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 27 2022, an architect has been selected and the project was presented at the Mount Dora Development Review Committee meeting on May 25, 2022, for a site plan review. Information regarding a general contractor or contracting method is not available and although a firm construction timeline has not been established, it is not likely to begin before late third or fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents