Similar Projects
Skunk Hollow Pond for Regional Downtown Area - STM 18 - City of Littleton
Infrastructure
Conception
$500,000 CJ est. value
Littleton, CO 80122

Rangeview Gulch Detention - STM 02 - City of Littleton
Infrastructure
Conception
$700,000 CJ est. value
Littleton, CO 80120

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

Mainstay Suites Parking Lot Improvements
Alteration
Post-Bid
Englewood, CO 80112

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Inverness Lane West Asphalt Rehabilitation 2021
Infrastructure
Results
Englewood, CO 80112

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

DA Office Pavement Mill and Overlay/C&G Replacement - Arapahoe County
Infrastructure
Conception
$250,000 CJ est. value
Centennial, CO 80111

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

Goldsmith Gulch Final Phase Improvements - Huntington-Caley Open Space
New Construction, Infrastructure, Alteration
Post-Bid
Greenwood Village, CO 80111

Piney Creek Lift Station Upgrades
Renovation, Infrastructure
Results
$4,182,300 CJ est. value
Aurora, CO 80011

RiverPark Mixed-Use Project / Littleton
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Littleton, CO 80120

Last Updated 05/05/2023 02:15 PM
Project Title

Sun Empire Industrial Park Phase 1

Physical Address View project details and contacts
City, State (County) Aurora, CO 80011   (Arapahoe County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $90,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 will include one Building 1A 624,094-square-foot building and one Building 1B 204,859-square-foot building, cross dock. 3.9 million total build out. As of April 10, 2023, construction had commenced by the end of February 2023. Public information indicates this project is under construction.

Details

,, 828,953 SF - 624,094 SF. 1 Story Above Grade, 204,859 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents