Similar Projects
Last Updated 01/27/2020 10:40 AM
Project Title

2019 600 South 300 West to Main Street, 100 West and 200 West Improvements

Physical Address View project details and contacts
City, State (County) Heber City, UT 84032   (Wasatch County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,667,055
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes installing road widening with approximately 6,230 SF of asphalt pavement, 77,500 SF of pulverize regrade & compact existing roadway, 76,400 SF of 4” asphalt pavement, 4,930 SF of 3” asphalt pavement, 10,800 SF 4” asphalt pavement repair, pavement striping, 960 LF of curb & gutter, 4,570 SF of concrete sidewalk, 1,443 LF of 8” Water Line, 3,187 LF of 6” Irrigation Line, water and irrigation services, catch basins, storm drain pipes, etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents