Similar Projects
Painting, as Needed - Market Rate Properties
Alteration
Bidding
$50,000 est. value
Milwaukee, WI

Water Tower Paint Rehabilitation
Post-Bid
$285,000 est. value
Suamico, WI

Interior Painting at WFO in Green Bay, WI
Post-Bid
$25,000 est. value
Green Bay, WI 54313

250,000 Gallon Water Storage Tank Paint Recoating
Renovation
Results
Freedom, WI

Cleaning, Repairing, And Painting
Renovation
Results
Marshfield, WI

Painting (Labor Only) in Blocks 12, 14, and 17 for Phase 4B Townhomes at Westlawn Gardens Phase 2
Alteration
Post-Bid
Milwaukee, WI

2021 Time & Material Parks Facilities
Term Contract
Results
Milwaukee, WI

AWWTP L-Building Painting
Alteration
Post-Bid
Appleton, WI 54915

Tower 2 Exterior Recoating
Results
Altoona, WI

Painting of Communications Tower
Alteration
Post-Bid
Black Creek, WI 54106

Painting Services
Alteration
Results
Green Bay, WI

80--Interior Prep, Prime, And Paint
Term Contract
Post-Bid
Sturgeon Bay, WI 54235

Interior and Exterior Painting
Alteration
Results
Danbury, WI 54830

Paint Interior Common Areas
Alteration
Post-Bid
Milwaukee, WI

Water Reservoir Painting -GPC
Alteration
Results
$400,000 est. value
Waupun, WI

Reported 07/22/2022 12:00 AM
Project Title

2022 Nine Springs Wastewater Treatment Plant Coating Project

Physical Address View project details and contacts
City, State (County) Madison, WI 53713   (Dane County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 2022 Nine Springs WWTP Coating Project will include preparation and coating of three Headworks screening unit channels and seven areas of concrete deterioration and exposed rebar on Primary Tanks 5, 6 and 7. The total square footage of area to be prepared and coating in the Headworks building is approximately 1,545 sq. ft. and includes both walls and ceilings of the channels. The total square footage of area to be prepared and coating in Primary Tanks 5, 6 and 7 is approximately 280 sq. ft. The project is located at the Nine Springs Wastewater Treatment Plant, 1610 Moorland Road, Madison, Wisconsin

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents