Similar Projects
Median Crossover Construction - TH 35
Infrastructure
Conception
$500,000 CJ est. value
Annandale, MN 55302

Median Crossover Construction - TH 35
Infrastructure
Conception
$500,000 CJ est. value
Annandale, MN 55302

Trunk Utilities to Lake John
Infrastructure
Bidding
$400,000 CJ est. value
Annandale, MN 55302

Trunk Utilities to Lake John
Infrastructure
Bidding
$400,000 CJ est. value
Annandale, MN 55302

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

2021 Site Improvements
Results
Monticello, MN 55362

2021 Street Improvements Project
Results
Maple Lake, MN

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Niche Inscriptions on City Owned Columbarium / Ossuary
Infrastructure
Bidding
$300,000 CJ est. value
Monticello, MN 55362

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

Otsego 2021 Street Renewal
Infrastructure
Results
$525,000 est. value
Otsego, MN

Last Updated 11/01/2022 12:11 PM
Project Title

73rd Street and 85th Street Roadway Improvement Project

Physical Address View project details and contacts
City, State (County) Buffalo, MN 55313   (Wright County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $387,895 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 1, 2022, the project has been awarded. A timeline for construction has not been confirmed. Type of Work: Grading, aggregate base, bituminous surfacing, culvert pipe and turf establishment. Approximate major items of work are: o Excavation - Common: 2,751 CY; o Excavation - Subgrade: 225 CY; o Common Embankment (CV): 3,883 CY; o Granular Embankment (CV): 406 CY; o Aggregate Surfacing Class 1: 2,709 TON o Aggregate Base Class 5: 850 TON; o Shoulder Base Aggregate Class 1: 318 TON; o Type SP 9.5 Wearing Course Mix (2,B): 442 TON; o Type SP 12.5 Non Wearing Course Mix (2,B): 590 TON; o 15" RC Pipe Culvert, CL V: 120 LF; o 60" RC Pipe Culvert, CL III: 40 LF; o Random Rip Rap Class II: 140 CU YD; o Silt Fence, Type MS: 6,052 LF; o Common Topsoil Borrow: 337 CY; o Rolled Erosion Prevention Category 25: 1,930 SY o Seeding: 3.1 AC; o Hydraulic Bonded Fiber Matrix: 6,160 LB Project Start Date:05/23/2022 Construction Start Date:05/23/2022 Construction End Date:10/14/2022 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents