Similar Projects
West Fallowfield Road Drainage Improvement Project
Infrastructure
Bidding
Adamsville, PA 16110

Milling, Base Repairs, Resurfacing, Guide Rail, Drainage, and ADA Ramps of South Franklin Street
Post-Bid
Cochranton, PA 16314

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Inlet Road Culvert Replacement
Results
Linesville, PA 16422

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Cambridge Springs Junior/Senior High School Parking Area Drainage Improvements
Post-Bid
Cambridge Springs, PA 16403

PA 618 Bridge/Conneaut Lake Trib
Results
$200,000 to $499,999 est. value
PA

Fries Road Culvert No 1 Replacement Project
Post-Bid
Espy, PA 16424

2019 Crawford and Forest Shotcrete Group
Results
$200,000 to $499,999 est. value

Woodcock Road Drainage Improvement Project
Post-Bid
Saegertown, PA 16433

Lauderbaugh Road Culvert Rehabilitation Project
Results
Cochranton, PA 16314

Church Street Culvert Replacement Project
Infrastructure
Post-Bid
Cambridge Springs, PA 16403

Grove Road Culvert Replacement Project
Results
Guys Mills, PA 16327

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Post-Bid

Fisher Road Culvert Replacement 2020
Results
Saegertown, PA 16433

Last Updated 06/29/2021 11:55 AM
Project Title

Construction of the East Fallowfield Stream Crossing Replacement and Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Atlantic, Hartstown, PA 16111   (Crawford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract consists of the installation of two stream culvert pipes that will be placed with streambed material and stream banks through the structures, reconstruct approximately 180 ft of streambank stabilization, install 140 LF of HDPE pipe (with headwalls and endwalls), install 842 LF of underdrain, install 842 LF of tile drain (solid pipe), place, compact and reconstruct approximately 620 ft of outsloped shale road fill, reconstruct approximately 830 ft of road surface on top of the shale road fill. The Contract is located on McMasters Road within East Fallowfield Township, Crawford County. McMaster Road begins at the intersection of Laird Road and ends at the intersection of Atlantic Road near Atlantic, PA. The project location begins approximately 700 feet south of the intersection of McMasters Road and Laird Road and continues for 1,250 feet, terminating approximately 75 feet south of the stream crossing.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents