Similar Projects
Services Decommissioning of Monitoring/Recovery Wells within All Five (5) Boroughs of New York City
Term Contract, Infrastructure
Bidding
New York, NY

Pump System Rebuild
Infrastructure
Bidding
East Concord, NY 14055

Sanitary Sewer Improvements/Replacement of Grinder Pumps
Post-Bid
Sand Lake, NY 12153

Water District 12 Wellfield Improvements Project
Post-Bid
Monroe, NY 10950

Replace Relief Wells at Portville Flood Control Project
Results
$1,000,000 to $2,000,000 est. value
Portville, NY 14770

Maintenance Contract for the Town of Bethlehem Well Pumping Systems
Term Contract
Results
Delmar, NY 12054

Wellhead Treatment for Emerging Contaminats and Nitrate Removal
Infrastructure
Bidding
Great Neck, Manhasset, NY 11030

Submersible Pumps
Post-Bid
White Plains, NY 10601

Furnish and Deliver Decant Pumps and Mixers for Erie County Water Authority
Results
Cheektowaga, NY 14227

Peerless Turbine Pump Installation and Rebuild
Infrastructure
Bidding
Williamsville, NY

Replacement of the Fire Pump at Riverview Towers and Replacement of the Water Heaters
Post-Bid
Less than $230,000 est. value
Ogdensburg, NY 13669

Replacement of Duplex Sump Pumps at School 23
Results
Yonkers, NY 10701

2022 Annual Well Maintenance Contract
Alteration
Bidding
Freeport, NY 11520

Screw Pump Replacement at Middletown WWTF
Post-Bid
Less than $600,000 est. value
Middletown, NY 10940

Pump Rebuild
Results
White Plains, NY 10601

Last Updated 01/07/2022 08:47 AM
Project Title

Rehabilitation of Well No 1A

Physical Address View project details and contacts
City, State (County) Rockville Centre, NY   (Nassau County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to rehabilitate Well No. 1A of the Incorporated Village of Rockville Centre Water Department. The rehabilitation shall include raising the well base, installing a new well pump and column pipe, and other associated work. Additionally, this project includes modifications to the well discharge piping, replacing valves, painting the piping, and replacing the existing FRP grating. Electrical scope includes removal of the existing exterior motor starter and furnishing and installing a new interior motor starter.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents