Similar Projects
Lake Lansing Road/Tower Avenue Intersection Reconstruction - City of East Lansing
Alteration
Conception
$400,000 est. value
Lansing, MI 48951

Aquatic Center - Resurface Parking Lot - City of East Lansing
Infrastructure
Conception
Less than $350,000 est. value
East Lansing, MI 48823

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

City View Lansing Apartments
New Construction, Infrastructure - 3,500 SF
Design
$25,000,000 CJ est. value
Lansing, MI 48933

Rehabilitation of Steam Manholes MH905 and MH910
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Reconstruct Drives Near Horizon and North Campus
Infrastructure
Post-Bid
Holt, MI 48842

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

3.15 MI of Full Width Concrete Reconstruction
Infrastructure, Alteration
Results
MI

Neogen Shiawassee Street Manufacturing Plant
New Construction, Infrastructure - 175,000 SF
Pending Verification
$70,000,000 CJ est. value
Lansing, MI 48912

Meridian Company Industrial Building
New Construction, Infrastructure - 31,355 SF
Pending Verification
$16,000,000 CJ est. value
East Lansing, MI 48823

Hagadorn: Pavement RehabilitationGrand River to Burcham, midblock crossing, ADA upgrades (STP) - City of East Lansing
Infrastructure
Conception
$1,790,272 est. value
East Lansing, MI 48823

New Patient Tower - Sparrow Health System / Lansing
New Construction, Infrastructure
Design
$350,000,000 CJ est. value
Lansing, MI 48912

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

Don Johnson Field House Roof and Sidewalk Replacement
Infrastructure, Alteration
Results
Lansing, MI 48912

Last Updated 05/31/2023 01:08 PM
Project Title

Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramps and Pavement Markings on M-52

Physical Address View project details and contacts
City, State (County) Stockbridge, MI 49285   (Ingham County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $322,520 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

0.63 mi of hot mix asphalt cold milling and resurfacing, sidewalk ramps and pavement markings on M-52 from Clinton Street to north of Morton Road in the Village of Stockbridge, Ingham County. Net classification required for this project is 294 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3A. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No M 33091 215582A N/A MDOT - 2305 035 - Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramps and Pavement Markings on M-52

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents