Similar Projects
2025 Road Improvements-- CAP2510 - City of Royal Oak
Renovation, Infrastructure
Conception
Royal Oak, MI 48067

Parking Lot Improvements - Ice Arena - ICE016 - City Of Novi
Infrastructure
Conception
$622,020 est. value
Novi, MI 48375

City Hall Campus Parking Lot Replacement
Infrastructure
Design
Farmington Hills, MI 48336

Construction of a Roundabout including, Concrete Curb, Gutter and Ramps, Guardrail on Taft Road
Infrastructure
Bidding
$3,922,000 est. value
Novi, MI 48374

West Bloomfield Towns Hall - Civic Center Drive Parking Lot Repairs
Infrastructure
Bidding
$200,000 est. value
West Bloomfield, MI 48323

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

Rest Area ADA Improvement Eastern Lower Peninsula - Interior
Post-Bid

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

1.20 MI of Hot Mix Asphalt Shared Use Path, Concrete Sidewalk and Ramps, Pedestrian Signals and Retaining Walls
Results
MI

Village Wood Road (Cranbrooke Drive to Haggerty Road) and Section 25 Storm Drainage Improvements - ENG081 - City of Novi
Infrastructure
Conception
$1,786,910 est. value
Novi, MI 48374

Hot Mix Asphalt and Concrete Paving, Add Left Turn Lane, Curb, Gutter and Sidewalk, Pavement Repairs and Pavement Markings on 10 Mile Road
Infrastructure
Bidding
$8,026,000 est. value
Novi, MI 48375

Rest Area ADA Improvement Eastern Lower Peninsula - Exterior
Post-Bid

Main Entrance Improvement Project
Results
Berkley, MI 48072

Meadowbrook Road (Village Wood Lake Park to Chattman Drive) - ENG069 - City of Novi
Infrastructure
Conception
$359,300 est. value
Novi, MI 48374

Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on 14 Mile Road
Infrastructure
Bidding
$4,669,000 est. value
Madison Heights, MI 48071

Reported 06/21/2022 12:00 AM
Project Title

Bloomfield Township 2022 Safety Path Program

Physical Address View project details and contacts
City, State (County) Bloomfield Township, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Division A: Telegraph Road, East Side, Hickory Grove to Franklin/Square Lake Construct approximately 17,710 sft of 4" and 6" thick concrete safety path and ADA ramps/landings,721 syd of concrete drive approaches, miscellaneous landscaping and other items for a complete project. Division B: Woodward Avenue, East Side, North of Maywood Construct approximately 905 sft of 4" and 6" thick concrete safety path and ADA ramps/landings, 228 syd of concrete drive approaches, miscellaneous landscaping and other items for a complete project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents