Similar Projects
Wiley Creek Assisted Living Facility
Addition, Demolition, New Construction, Infrastructure - 25,650 SF
Design
$7,000,000 CJ est. value
Sweet Home, OR 97386

Albany Helping Hands
Addition, Demolition, Build-out, Infrastructure - 1,716 SF
Design
$400,000 CJ est. value
Albany, OR 97322

Albany Train Station Restroom
New Construction, Infrastructure - 276 SF
Bidding
$300,000 CJ est. value
Albany, OR 97321

North Fork (Beachie Creek) Guardrail
Infrastructure
Bidding
$1,000,000 CJ est. value
Lyons, OR 97358

North Albany Elementary School (NAES) and Waverly Elementary School (WES)
New Construction, Infrastructure
Post-Bid
$300,000 est. value
Albany, OR 97321

Lebanon Fire District Phase 1
New Construction - 14,000 SF
Post-Bid
$7,000,000 est. value
Lebanon, OR 97355

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Transit Stop Improvements Phase 1
Infrastructure
Results
$206,197 CJ est. value
Albany, OR 97321

Calapooia Commons
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Albany, OR 97321

9th Avenue Residential Subdivision
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Sweet Home, OR 97386

Lebanon Headquarters Station Replacement
Renovation
Post-Bid
$10,000,000 CJ est. value
Lebanon, OR 97355

RFQ Contractor - Foster Creek Dam Turbine and Generator Rehabilitation
Renovation, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Sweet Home, OR 97345

RFQ Construction Manager - CM/GC Westside Sewer Interceptor Sanitary Sewer Transmission Main
Infrastructure
Post-Bid
$18,000,000 CJ est. value
Lebanon, OR 97355

Utilizing Factory-Built Buildings to Construction 8 Stand-alone Classroom Building at South Shore Elementary School
New Construction, Infrastructure
Post-Bid
$8,400,000 CJ est. value
Albany, OR 97322

South Shore Elementary School Phase II - Bid Package 1, 5 and 9
Addition, Demolition, New Construction, Infrastructure
Post-Bid
$1,318,000 CJ est. value
Albany, OR 97322

Last Updated 12/07/2022 08:13 PM
Project Title

Headquarters Station Replacement Fire Station 31

Physical Address View project details and contacts
City, State (County) Lebanon, OR 97355   (Linn County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $13,600,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of a new 26,000 sq ft. Fire station in Lebanon, Oregon. The project is scheduled to begin January, 2023 and be finished March, 2024. The prevailing wage rates for Public Works Contracts in Oregon (State ORS 279.348 - 279.380) Lebanon Fire District and Emerick Construction Co. may reject any bid not in compliance with all prescribed bidding procedures and requirements and may reject all bids if, in the judgment of Lebanon Fire District and Emerick Construction, it is in their best interest to do so. Emerick Construction will be submitting bids to self-perform the following bid packages: Cast in Place Concrete, Rough Carpentry, Misc. Steel Installation, Roof Hatch Install, Doors / Frames / Hardware Install, Fiberglass Windows, Visual Display Unit Install, Wall and Door Protection Install, Toilet, Bath and Laundry Accessories Install, Fire Protection Extinguishers / Cabinets Install, Misc. Specialties Install and Site Furnishings Install. As a requirement of the contract, Emerick will be submitting their self- perform proposals on 12/7/2022 (2 hours before the bid date/time for the Lebanon Fire Main Station Replacement project). Therefore, all supplier bids for the following sections 03 30 00: Cast In Place Concrete / Reinforcing, 03 30 03: Underslab Vapor Retarder, 06 11 00: Wood Framing, 06 15 00: Wood Decking, 06 16 00: Sheathing, 06 17 36: Metal Web Wood Joists, 06 18 00: Glued-Laminated Construction, 08 54 13: Fiberglass Windows If a bidder finds discrepancies in, or omissions from the drawings or documents, or has doubt as to their meaning, the bidder shall at once notify Emerick Construction in writing. Questions may be faxed to (503) 771-2933 or e-mail at billj@emerick.com. Deadline for questions 5 PM, 11/29/22. Sitework, General Trades, Plumbing, HAVC, Fire Protection, and Electrical for a new, one story fire station.

Details

1 Story Above Grade, 26,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents