Similar Projects
Last Updated | 10/19/2022 09:55 AM |
Project Title | Kennebec Street and Lockwood Avenue Water Main Improvements |
Physical Address | View project details and contacts |
City, State (County) | Waterville, ME 04901 (Kennebec County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $775,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of approximately 1,500 linear feet of water main replacement as well as fire hydrants and water services on Kennebec Street and Lockwood Avenue in Waterville, ME. Replacement of the existing water mains, fire hydrants and all service lines on Kennebec Street and Lockwood Avenue in Waterville, ME. Bids will be received for a single prime Contract. The Kennebec Water District will not be responsible for full or partial sets of Bid Documents, including Addenda if any, obtained from sources other than the District. Bids shall be contained in an envelope plainly marked: Kennebec Street & Lockwood Avenue Water Main Improvements, they will not to be Opened Until specified date and time. Bidders may be represented at bid opening if so desired. Faxed or e-mailed bids will not be accepted. The Kennebec Water District reserves the right to waive any informality in bids, to accept any bid, and to reject any or all bids should it be deemed in the best interest of the District to do so. No bidder may withdraw their bid within 60 days after the actual date of the bid opening A pre-bid conference will be held at the District's Business Office located at 6 Cool Street, Waterville, Maine 04901. Attendance at the pre-bid conference is not mandatory, but strongly encouraged. Pre-Bid Zoom Meeting- Dial by your location +1 301 715 8592 US (Washington DC) +1 309 205 3325 US +1 312 626 6799 US (Chicago) +1 646 931 3860 US +1 929 205 6099 US (New York) +1 669 900 6833 US (San Jose) +1 719 359 4580 US +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 386 347 5053 US +1 564 217 2000 US +1 669 444 9171 US Meeting ID: 875 1011 4190 Find your local number: https://us06web.zoom.us/u/kenFAjGBLM The project includes replacement of the existing water mains, fire hydrants and all service lines on Kennebec Street and Lockwood Avenue in Waterville, Maine. The Contractor shall provide all materials, equipment and services inherent to and required for the completion of the Work. This Work and all associated Work shall be completed in accordance with the Project's Drawings and Specifications. All work must be completed on or before July 31st, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |