Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Terminal Area Development - Rebid
New Construction, Infrastructure - 3,552 SF
Post-Bid
$1,900,000 CJ est. value
Versailles, OH 45380

Sanitary Sewer Relining Phase I
Infrastructure
Results
$72,572 CJ est. value
Ansonia, OH 45303

Sanitary Sewer Relining Phase I
Infrastructure
Results
$72,572 CJ est. value
Ansonia, OH 45303

School Building Expansion Project - Versailles Exempted Village Schools
Addition, Demolition, Infrastructure
Construction
$10,000,000 CJ est. value
Versailles, OH 45380

Resurfacing of Butler Township Roads
Infrastructure
Post-Bid
$183,000 CJ est. value
Arcanum, OH 45304

ADA Doty Storm Outlet
Infrastructure
Results
$478,784 CJ est. value
Arcanum, OH 45304

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Elm Street Sidewalk Construction
Infrastructure - 4,900 SF
Post-Bid
$106,790 CJ est. value
Hollansburg, OH 45332

Greenville YOLO Park Restroom
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Greenville, OH 45331

Gordon North Street Improvements
Infrastructure
Post-Bid
$448,800 CJ est. value
Gordon, OH 45304

Greenville Asphalt Repair
Infrastructure
Post-Bid
$250,000 CJ est. value
Greenville, OH 45331

Rehabilitate Runway 9/27
Infrastructure
Post-Bid
$305,000 CJ est. value
Versailles, OH 45380

Resurfacing of Rhynard-Fink Road
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Allen Township, OH 45362

Last Updated 06/27/2023 06:07 PM
Project Title

Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) New Madison, OH 45346   (Darke County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,515,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of New Madison (Owner) is requesting Bids for the construction of the following Project: Wastewater Treatment Plant Improvements 702722 The Project includes the following Wack: Replacing the Rush Road Lift Station pumps with larger pumps, coating the existing wet-well and upstream manhole, and miscellaneous repairs to address corrosion in the control's enclosure. *Replacing the influeat fins scresa and suplacing grit tank baffles at the Hanchworks structura. Coating the existing channels, installing windows, replacing the overboad.coiling door, installing a radioteater and associated propane tank, and installing now fm and louvar in aisting building that houses the screen. Recosting steal components on the oxidation ditches/internal clarifiers as noted on project drawings. Replacing steal supports for the rotor covers and replacing the rotor motors, drives, and bearings in the excidation disches, and replacing the clarifier drives and surface scumscrapers in the clarifiers. Replacing the UV disinfection systeO Replacing the WAS/scum lift station pumps in kind. Building two additional sented sludge storage tanks to ensure that 30 days of retention are provided and replacing the threesludge storage/post scration Mowers with larger unit Building three additional shudge drying beds and extending the dried sludge storage area, with conceste pad. Installing new polymer mit and polymer ming vault with manifold associated with shodge drying. Replacing the plant drain lift station pumps in kind. Upgrading the site's electrical system as required to install the new equipment and installing a new talemetry system to replace the existing dialar. The work also includes yard piping, process piping, demolition, excavation, dewatering, regrading crushed stone access area and sidewalk, landscaping, coatings, electrical, instrumentation and control, cles up, and all other apportances necessary to completes the work shown on the project drawings and included in the project manual Bida are requested for the following Controt: New Madison Wastewater Treatment Plant Improvements/702722 15 The Project has an expected duration of 420 days. Obtaining the Bidding Documents Information and Bidding Documents for the Project can be found at the following designated online Bonding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, avwa. if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan bolders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addonds, and other Bidding Documents will be offered only through the designated website. Neither Owner or Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. MAN The Issuing Office for the Bidding Documents is Weader ering 80 STATE ROUTE 103, SUITE C Bluffton, OH 4581.7 Partial sets of Bidding Documents will not be available from the Iraning Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other them the Issuing Office. Bidding Documents may be purchased from the Isming Office during the hours indicated above Make deposit checks for Bidding Documents payable to Wessler Engineering. Cost does not include shipping charges. Upon Issuing Office's receipt of payment, printed Bidding Documents will be sent via the prospective Bidder's delivery serviceor electronic documents will be available to download from online The shipping charge amount will depend on the shipping method chosen. Bidding Documents are available for purchase in the following formats:Farmal Pricted Bidding Documents (including Full-Size Drawings and Project Manual) Electronic download of Bidding Documents from Plan Room-Wester Engineering For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, bydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Material. The Work shall include improvements to the Rush Road Lift Station and the WWTP including: 1. Replacing the Rush Road Lift Station pumps with larger pumps, coating the existing wet-well and upstream manhole, and miscellaneous repairs to address corrosion in the control's enclosure. 2. Replacing the influent fine screen and replacing grit tank baffles at the Headworks structure. Coating the existing channels, installing windows, replacing the overhead coiling door, installing a radiant heater and associated propane tank, and installing new fan and louver in existing building that houses the screen. 3. Recoating steel components on the oxidation ditches with internal clarifiers as noted on project drawings. Replacing steel supports for the rotor covers and replacing the rotor motors, drives, and bearings in the oxidation ditches, and replacing the clarifier drives and surface scum scrapers in the clarifiers. 4. Replacing the UV disinfection system. 5. Replacing the WAS/scum lift station pumps in kind. 6. Building two additional aerated sludge storage tanks to ensure that 30 days of retention are provided and replacing the three-sludge storage/ post aeration blowers with larger units. 7. Building three additional sludge drying beds and extending the dried sludge storage area, with concrete pad. Installing new polymer mixing unit and polymer mixing vault with manifold associated with sludge drying. 8. Replacing the plant drain lift station pumps in kind. 9. Upgrading the site's electrical system as required to install the new equipment and installing a new telemetry system to replace the existing dialer. 10. The work also includes yard piping, process piping, demolition, excavation, dewatering, regrading, crushed stone access area and sidewalk, landscaping, coatings, electrical, instrumentation and control, clean up, and all other appurtenances necessary to complete the work shown on the project drawings and included in the project manual.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents