Last Updated | 11/04/2022 09:09 AM |
Project Title | 5th, 7th, & 8th St. S. and Fargo Ave. Reconstruct - 245 - City of Wahpeton |
Physical Address | View project details and contacts |
City, State (County) | Wahpeton, ND 58075 (Richland County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $637,484 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Complete reconstruction of 7th & 8th Street South between Dakota Avenue and Fargo Avenue. Replace curb, sidewalk, edge mill and overlay along 5th Street S. from Dakota Avenue to railroad tracks. Reconstruction of Fargo Avenue from 8th Street to 9th Street. Description of each segment is listed below: 5th Street S. from Dakota Ave. to the railroad tracks: New curb and gutter, subgrade preparation, geotextile fabric, edge drains, aggregate base course, and 5.5 inches of bituminous pavement. Also replace existing 6 inch water main. This watermain has no services off from it, look at funding with water fund. 7th Street S. from Dakota Ave. to Fargo Ave.: New curb and gutter, subgrade preparation, geotextile fabric, edge drains, aggregate base course, and 5.5 inches of bituminous pavement. Extend 6 inch watermain to Fargo Ave. to service Three Rivers Decorating and Snap Fitness. Replace the 8 Inch sanitary sewer Line. 8th St. S. from Dakota Ave. to the railroad tracks: New curb and gutter, subgrade preparation, geotextile fabric, edge drains, aggregate base course, and 5.5 inches of bituminous pavement. Also replace existing 12 inch water main. This watermain has no services off from it, look at funding with water fund. Fargo Ave. from 8th St. to 9th St.: Replace the existing bituminous alley with 15' wide concrete alley. Parking area on south side of alley is planned with crushed concrete to help keep costs down. Consideration should be given to extending storm sewer to Fargo Ave. to pick up additional storm water. Consideration should also be given to extending sanitary sewer from Dakota Ave. to Fargo Ave. for lot development/connection to city sewer and water. Project to be coordinated with project number 510 Dakota Ave. Side Streets Phase 2. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of November 4, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |