Similar Projects
Pressure Reducing Valves Replacement Charter Street Heating Plant
Alteration
Bidding
Madison, WI 53715

Motor Generator Upgrade
Renovation
Post-Bid
Madison, WI

Boilers and Installation of Boilers
Alteration
Post-Bid
Madison, WI 53705

Utility Renovations
Results
Less than $3,000,000 est. value
Madison, WI 53703

Lakeside Cottage B Boiler Replacement
Results
Less than $232,000 est. value
Madison, WI 53704

Monona Terrace Heat Exchanger Maintenance
Alteration
Post-Bid
Madison, WI 53703

Clean Sweep Building Boiler System
Results
Madison, WI 53718

Educational Science and Horticulture Site Utility Replacements - GPC
Infrastructure, Alteration
Post-Bid
$1,600,000 est. value
Madison, WI

Biochemistry Cryo-Electron Microscopy Renovation -MEP
Results
Less than $1,400,000 est. value
Madison, WI 53706

2022 Annual Boiler Preventative Maintenance Service
Term Contract
Post-Bid
Madison, WI 53713

Heating Distribution Upgrades - MEP
Results
$2,870,000 est. value
Madison, WI 53705

Heating Distribution Upgrades - General
Results
$2,870,000 est. value
Madison, WI 53705

Green Bay Boiler Replacement
Results
$166,000 est. value
Madison, WI

Blower Motor Replacement/Installation
Results
Madison, WI 53701

Kennedy Elementary School Boiler Replacement 2021
Results
$325,000 est. value
Madison, WI 53714

Last Updated 03/31/2022 07:39 AM
Project Title

Charter Street Heating Plant

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: removal and replacement of approximately 20 lineal feet of underground 48-inch prestressed concrete chilled water pipe. Work shall include all provisions necessary to fully incorporate such products into the work, including, as necessary, fasteners, backing, supports, piping, conduit, conductors and other such provisions from point of service to point of connection, and field finishing, as shown on drawings and specified herein. Installing contractor shall have experience installing underground pre-stressed concrete cylinder pipe of at least 30-inch diameter in the last 12 months.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Schedules for HVAC, Schedules for HVAC Piping and Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents