Last Updated | 06/16/2023 10:14 AM |
Project Title | Grocery Outlet / Winters |
Physical Address | View project details and contacts |
City, State (County) | Winters, CA 95694 (Yolo County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation |
Project Status | All Bids Received, Selection Underway, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,300,000 [brand] Estimate |
Plans Available from | Owner |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Plans call for the construction of a grocery store. This project consists of Site Development and Construction of a new 16,000 sf Grocery Outlet shell building and associated site improvements for +/- 4.12 Acres As of April 10, 2023, this project has been released for General Contractor bidding. Trades required include: Surveying: Staking for onsite improvements. Site Clearing, Demolition and Grading: Per plan. Site Paving: Asphalt paving per plan. Wet Utilities: Wet utilities per plan. Site Electrical Utilities: Site Electrical and Site Lighting Per Plan. Site Lighting & Public Street Lighting: New Street lighting per plan Site Concrete: Concrete Curbs, Gutters, Sidewalks, Driveways, and other improvements. Site Markings: Striping and Signage on Site Site Fencing: Fencing located onsite per plans. Landscaping: Per plan. Concrete: Building Slabs & footings and misc. concrete per plan. Masonry: Building Masonry and Site Masonry per plan. Structural & Misc. Steel: Structural and misc. steel per plan. Rough Carpentry: Roof structure and sheathing, interior plywood and misc. blocking per plan. Insulation: Per plans. Roofing: Per plans. Sheet Metal: Sheet metal flashing. Caulk and Sealant: Per plans. D.F.H: Per plans. Overhead Doors: Per plans. Storefront: Storefront per plan. Auto Doors: Auto Doors per plan. Plaster: Exterior plaster per plan. Steel Studs and Drywall: Per plans. Painting: Per plans and specifications. Toilet Partitions and Accessories: Per plans. Loading Dock Equipment: Per plans. Fire Protection: Fire sprinklers per plan. Plumbing: Per Plan. Electrical: Per plan. As of June 16, 2023, the project is temporarily on hold. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to July 2023, lasting six months, completing in January 2024. |
||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 16,000 SF. Parking Spaces, 64 Parking Spaces.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |