Similar Projects
CR 1840 / Brown Bridge Road at CR 13 / Magnet Road
Infrastructure
Design
$1,000,000 CJ est. value
Covington, GA 30014

CR 1840 / Brown Bridge Road at CR 13 / Magnet Road
Infrastructure
Design
$1,000,000 CJ est. value
Covington, GA 30014

Paving Improvements for Newton County Board of Education
Infrastructure
Bidding
$500,000 CJ est. value
Covington, GA 30014

Paving Improvements for Newton County Board of Education
Infrastructure
Bidding
$500,000 CJ est. value
Covington, GA 30014

Electric Utility Right-Of-Way Clearing
Term Contract
Post-Bid
Covington, GA

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Replacement Eastside High School Roundabout And R-Cut Accesses
Results
Covington, Oxford, GA

5.650 Miles of Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 212 Beginning East of Ashley DR and Extending East to Covered Bridge Road
Infrastructure
Results
Covington, GA 30016

Render Covington
New Construction, Infrastructure
Pending Verification
$120,000,000 CJ est. value
Covington, GA 30014

Alcovy Road Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Covington, GA 30014

SR 81 at Dried Indian Creek in Covington
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Covington, GA 30016

Rocket Carwash / Covington
New Construction, Infrastructure - 3,740 SF
Post-Bid
$848,980 CJ est. value
Covington, GA 30014

LMIG Resurfacing
Infrastructure
Results
Covington, GA

Clark Street Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Covington, GA 30014

SR 162 at SR 212
Infrastructure
Design
$2,000,000 CJ est. value
Covington, GA 30016

Last Updated 04/22/2023 08:03 AM
Project Title

Access Road at I-20 From East of Crowell Road to West of Harold Dobbs Road - Realignment and Intersection Improvements Project

Physical Address View project details and contacts
City, State (County) Covington, GA 30016   (Newton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,540,673 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Realignment to Crowell Rd and Harold Dobbs Rd Questions Due Date: Apr 11th 2023, 11:00 AM EDT Digital copies of the CONTRACT DOCUMENTS, specifications, and drawings may be obtained at the Newton County Procurement Portal website, www.co.newton.ga.us , at no charge. Please direct any questions regarding the CONTRACT DOCUMENTS or access to the Procurement Portal to Randi Fincher at 678-625-1237 or rfincher@co.newton.ga.us. Answers to all questions shall be provided a minimum of 72 hours prior to the time of the bid.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents