Similar Projects
Street Resurfacing and Sewer System Improvements
Post-Bid
Valleyview, OH

Wastewater BMP Cleanout
Post-Bid
Columbus, OH 43215

Bicentennial Improvements 2020
Results
Columbus, OH 43205

Olentangy River Road Storm Sewer Improvement
Results
$269,430 est. value
Columbus, OH

Infrastructure Renewal
Alteration
Post-Bid
$600,991 est. value
Columbus, OH 43227

Holt Avenue / Somersworth Dr. Stormwater System Improvements
Results
Columbus, OH 43219

Repair Flower Bed Drainage DFAS Building 21 DSCC - MATOC Northeast Region Contractors Only
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Whitehall, OH 43213

2021 Storm Structure Maintenance Program
Infrastructure
Results
$225,000 est. value
Dublin, OH

2021 Alley Drainage Improvement Project: Hickory Alley Storm Sewer
Infrastructure
Results
$379,715 est. value
Groveport, OH 43125

Second Barrel Interconnector Augmentation
Infrastructure
Results
Lockbourne, OH 43137

2021 Storm Sewer Improvements Project
Infrastructure
Results
$315,500 est. value
Minerva Park, OH

Pinnacle Park Drive Parts 1 and 2
Infrastructure
Results
$1,314,276 est. value
Grove City, OH

Northam Park Phase I Stormwater Improvements
Infrastructure
Results
Upper Arlington, OH

Mulford Avenue Storm Sewer Improvements
Infrastructure
Results
$282,095 est. value
Grandview Heights, OH 43212

Roadway Improvements Stormwater Regional Basins Parsons Avenue
Infrastructure
Results
Columbus, OH 43227

Last Updated 06/30/2022 08:21 AM
Project Title

Prairie Township Private Storm Sewer And Stormwater Facilities Sports Complex Phase 3 - 1

Physical Address View project details and contacts
City, State (County) Columbus, OH 43228   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,043,242
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work generally consists of the construction of parking lots, roadways, a multi-use field, multi-use courts, and associated storm sewer and grading for the Sports Complex. The project also includes all surface restoration of areas disturbed by the construction and related appurtenances and equipment, including all labor, materials and equipment necessary to complete the construction in accordance with the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents