Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Illinois Bridge Pedestrian Crossing Improvements - City of Mason City
Infrastructure
Conception
$200,000 CJ est. value
Mason City, IA 50401

2022 HMA Alley Reconstruction Project
Infrastructure
Design
$57,000 CJ est. value
Clear Lake, IA 50428

2022 Street Resurfacing Project : Division 1
Infrastructure
Design
$320,000 CJ est. value
Clear Lake, IA 50428

HMA Resurfacing/cold in-place Recycling - US 63
Infrastructure
Bidding
$5,000,000 CJ est. value
Waverly, IA 50677

Shell Rock Bend WMA Road Maintenance
Infrastructure
Bidding
$60,000 CJ est. value
Allison, IA 50602

Tipton Concession, Sidewalks and Fencing Project
Infrastructure, Renovation - 9,000 SF
Post-Bid
$500,000 CJ est. value
Tipton, IA 52772

Parking Lot Improvement Project at Clinton Community College (MAin Campus)
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

PCC Sidewalk/Trail - S34 T72 R34
Infrastructure
Results
IA

2022 Road Program
Infrastructure
Results
$289,643 CJ est. value
Boone, IA 50036

Cedar Heights Drive Reconstruction - 111 - City of Cedar Falls
Infrastructure
Construction
$7,173,000 CJ est. value
Cedar Falls, IA 50613

Fog Seal
Infrastructure
Pending Verification
$549,553 CJ est. value
Tipton, IA 52772

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

Highway 122 Reconstruction - City of Mason City
Infrastructure
Conception
$11,150,000 CJ est. value
Mason City, IA 50401

Construction of Sidewalks, a Parking Lot, Driveway, Retaining Walls, Storm Drainage System, and Grading
Infrastructure
Post-Bid
$800,000 est. value
Corning, IA 50841

Last Updated 09/18/2023 10:01 AM
Project Title

Humboldt Downtown Streetscape Project

Physical Address View project details and contacts
City, State (County) Humboldt, IA 50548   (Humboldt County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is currently in planning and design phase, but has had the budget for this approved by the city council. As of September 18, 2023, no new information available

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents