Similar Projects
Design-Build Services for Bard High School Early College
Results
Washington, DC 20032

2215 5th Street Northeast Building Renovations - AM0-BRM16 - District of Columbia
Addition, Infrastructure, Renovation
Conception
$9,400,000 CJ est. value
Washington, DC 20002

Design-Build Services for School Without Walls at Francis Stevens Education Campus
Renovation, Addition - 126,000 SF
Results
Washington, DC 20037

Last Updated 09/14/2022 10:17 AM
Project Title

RFP Construction Manager at Risk - DC Infrastructure Academy at Spingarn High School

Physical Address View project details and contacts
City, State (County) Washington, DC 20002   (District of Columbia County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $43,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Last Day for Questions: July 29, 2022 by 4:00 P.M. The Spingarn High School building has been vacant since the 2012/2013 school year and is in a current state of extensive disrepair. The Project scope generally includes the hazardous-material remediation of the entire facility, interior demolition and modernization of an estimated 50,000 SF, new exterior construction of an estimated 12,000 SF of infrastructure simulation areas, general exterior improvements around the facility, and a stabilization of the remainder of the Spingarn High School building. As part of the 50,000 SF interior demolition and build out, it is expected that the facility will receive modernizations to include, but not be limited to following existing spaces: Main Entrance/Lobby, Auditorium, Gym, Cafeteria/Kitchen, classrooms, restrooms, and corridors. While the Project scope only requires a portion of the building to be modernized, DGS ultimately would prefer that those portions of the building not part of the modernization be converted to a 'cool dark shell' to provide a minimal amount of stabilization space for further expansion of the DCIA and/or other potential future users. Offerors are required to submit with their Proposals a bid bond in the amount of five percent (5%) of bid amount, in the form included as Attachment F. All bonding companies must be included on the Department of Treasury's Listing of Approved Sureties. Alternatively, Offerors may submit a cashier's check in lieu of a bid bond. However, in the event an Offeror who is awarded the Agreement fails to post a payment and performance bond for the full value of the Agreement, the Offeror shall thereby forfeit the full amount of the cashier's check, and the Department shall collect such funds. If the Offeror chooses to submit a cashier's check in lieu of a bid bond, the Offeror must complete the form included as Attachment N and return, notarized, with the Offeror's Proposal. Notice to Award: on or about September 15, 2022 (projected)

Details

50,000 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents