Similar Projects
Reported | 06/01/2022 12:00 AM |
Project Title | Kulani Correctional Facility 0.5 MG Tank Repair |
Physical Address | View project details and contacts |
City, State (County) | Hilo, HI 96720 (Hawaii County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | $175,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Repair of 500,000 gallon Potable Water Tank at the Kulani Correction Facility, Island of Hawaii 1. Install BMP requirements per the plans, specifications and county standards. 2. Provide internal inspection of the tank. Drain the tank and provide equipment necessary for the design engineer to inspect the inside of the tank at the leak. 3. Notify the Kulani Facilities Manager at least one (1) month prior to scheduling of draining of the tank. 4. Repair the leak in the tank in accordance with the plans and any additional repairs necessary based on the internal tank inspection. 5. Perform disinfection of the tank and system in accordance with the plans, specifications and AWWA standards. 6. Perform water sampling and testing to ensure proper disinfection of the system prior to bringing the tank back into service. 7. Repair the leak in the 660,000 gallon steel water storage tank including all incidentals required to complete the work. 8. Include any and all parts, materials, labor and equipment into the cost to complete the project. 9. This project requires you to be bonded. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |