Similar Projects
Replace Roof/ Camp Williams
Alteration
Conception
$568,800 est. value
New Lisbon, WI

Replace the Shingles on the Salt Shed
Renovation
Design
$42,909 CJ est. value
La Grange, WI 53190

Lower Roof Replacement - Gordon Hall
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Oshkosh, WI 54901

Glenwood Children Park Arch Repair
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Madison, WI 53711

DMC Green Roof Structural Reinforcement
Demolition, Alteration
Post-Bid
Milwaukee, WI 53203

Roof Replacement
Alteration
Post-Bid
$250,000 to $500,000 est. value
Racine, WI 53402

Roof Replacement
Alteration
Results
Prairie Farm, WI 54762

City Hall Roof Replacement
Alteration
Results
Rice Lake, WI 54868

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Construction
$328,400 CJ est. value
Milwaukee, WI 53209

Roof Replacement - Baraboo Armory
Renovation
Construction
$499,000 CJ est. value
Baraboo, WI 53913

Roofing and Metal Panels Replacement
Build-out
Sub-Bidding
$900,000 CJ est. value
Ashland, WI 54806

Sawyer County Courthouse BP 1
Post-Bid
Hayward, WI 54843

DMC Main Building Roof Replacement Areas 5, 33A-B and 20
Alteration
Results
Milwaukee, WI 53233

Roof Replacement MEP
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

1070 Carey St Roof Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Lake Geneva, WI 53147

Last Updated 04/17/2023 01:11 PM
Project Title

Roof 1 Replacement

Physical Address View project details and contacts
City, State (County) Madison, WI 53706   (Dane County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,227 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. In general the work consists of: the replacement of the insulation and membrane roofing on the 2,000 square foot penthouse Roof 1 in its entirety on a 16 story building. The scope includes replacement of the aluminum roof edge, metal access ladder, treated wood access platforms and stairs, lighting protection system (designed by licensed specialist), as well as repainting of the existing steel equipment dunnage and curb elements. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not1 affect the Federal Davis Bacon Act requirements.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents