Similar Projects
Last Updated | 04/13/2023 06:03 PM |
Project Title | RFQ D/B - Long Bridge Project North Package |
Physical Address | View project details and contacts |
City, State (County) | Manassas, VA 20110 (Manassas City County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Misc. Structures, Railroad/Subway, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected January 2025 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $1,900,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Long Bridge corridor is a vital link connecting the local, regional, and national transportation networks, and the project is critical to ensuring that the Long Bridge corridor can meet future rail needs. Current service along the corridor does not provide sufficient capacity and redundancy to meet projected future demand for railroad services in the region. The overall Long Bridge project will add capacity to a busy rail travel corridor through construction of a modern rail bridge from Washington, D.C. into Virginia. The corridor is a 1.8-mile railroad corridor between Rosslyn (RO) interlocking in Arlington, Virginia and L'Enfant (LE) Interlocking near 10th Street SW in the District of Columbia. The primary component of the Long Bridge project is a new two-track bridge upstream of the existing Long Bridge. The existing bridge will be retained to create a four-track crossing. The Long Bridge project additionally consists of environmental mitigation measures including a new bikepedestrian shared use path across the George Washington Memorial Parkway and the Potomac River. Request for Clarifications Due April 10, 2023 Shortlist Announced June 21, 2023 Release of RFP July 7, 2023 Proposals Due September 15, 2023 Announcement of Preferred Proposer October 20, 2023 Execution of Progressive Design-Build Agreement December 2023 NTP for Phase 1 Services December 2023 Start of Construction (other than Early Work) Q1 2025 Substantial Completion of Construction 2030 |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |