Similar Projects
Hurstbourne Commons
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Jeffersontown, KY 40299

Address Pavement Condition of PCC Pavement
Infrastructure
Conception
$7,250,000 CJ est. value
Louisville, KY 40291

Waterfront Park Expansion - Phase IV - Louisville Metro Government
Addition, Infrastructure
Design
$50,000,000 CJ est. value
Louisville, KY 40202

Riverport Tangent Loop Track
Infrastructure
Design
$200,000 CJ est. value
Louisville, KY 40202

Office Building Construction and MetaZoo Renovation Rebid
New Construction, Renovation, Infrastructure - 9,500 SF
Bidding
$7,500,000 CJ est. value
Louisville, KY 40202

Mitchell Hill Road Area Water Main Replacement
Infrastructure
Bidding
$3,000,000 CJ est. value
Louisville, KY 40118

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Request for Qualifications-General Contractors
Infrastructure
Post-Bid
Louisville, KY

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Stone Street Road Area Water Main Replacement
Results
$250,001 to $500,000 est. value
Louisville, KY 40272

Norton Healthcare Hospital at Opportunity Campus
New Construction, Infrastructure - 60,000 SF
Construction
$70,000,000 CJ est. value
Louisville, KY 40211

Old New Cut Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Fairdale, KY 40118

Home Emporium/Louisville
New Construction, Infrastructure - 25,000 SF
Pending Verification
$6,000,000 CJ est. value
Louisville, KY 40299

Address Pavement Condition of PCC Pavement on I-264 Both Direction(S)
Infrastructure
Conception
$11,500,000 CJ est. value
Louisville, KY 40220

American Printing House for the Blind Renovation and Expansion / Louisville
Addition, Demolition, Renovation, Infrastructure - 57,000 SF
Design
$9,320,000 CJ est. value
Louisville, KY 40206

Last Updated 08/24/2022 05:34 AM
Project Title

Idlewood Inline Storage Project

Physical Address View project details and contacts
City, State (County) Louisville, KY 40291   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,250,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Description and location of Project: This Contract provides for the installation of approximately 91 linear feet of 12-inch sewer, 221 linear feet of 72-inch sewer, and 690 linear feet of 108" sewer; 2 sanitary manholes; 3 large drainage structures; 2 flow control devices, erosion prevention and sediment control; and appurtenant work. The project is generally located along Cedar Creek, between Plumwood Road and Rimfire Road. All work shall be done in accordance to MSD's Standard Specifications. The Engineers Construction Cost Estimate for this project is between $ 2,750,000.00 and $ 4,250,000.00 . The Project Manager for this Invitation to Bid is Jacob L. Mathis, P.E.. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Jacob L. Mathis, P.E. at jacob.mathis@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) - FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below: If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate GOOD FAITH EFFORTS in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) - see MSD MBE/WBE Program - Construction Subcontracting Goal Documents and Forms electronically All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's Project Manager, Jacob L. Mathis, P.E. The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If selected as applicable above, the goals are as follows: 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. MBE and WBE businesses are encouraged to bid on this project as a prime contractor. The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents