Similar Projects
Chiller Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

HVAC Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

RCC Cooling Towers and Boilers Preventative Maintenance and Service
Term Contract
Post-Bid
Raleigh, NC 27601

Dabney Hall HVAC Evaluation and Upgrade Phase 2
Renovation - 139,000 SF
Results
Less than $2,700,000 est. value
Raleigh, NC

HVAC Renovations Price Music Hall
Results
Raleigh, NC

HVAC Water Treatment Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

DECPA HVAC Water Treatment
Term Contract
Post-Bid
Raleigh, NC 27601

Wake County Agricultural Services Building HVAC Renovation
Results
$1,000,000 to $1,500,000 est. value
Raleigh, NC 27600

Security System Installation and Repair
Term Contract
Bidding
Raleigh, NC 27610

HVAC Maintenance
Term Contract
Post-Bid
Raleigh, NC 27610

Charter Square Parking Deck Ventilation Upgrades
Results
Less than $300,000 est. value
Raleigh, NC 27601

Duct Cleaning IAQ
Term Contract
Bidding
Raleigh, NC 27610

Security, Lighting, and HVAC Controls
Post-Bid
Raleigh, NC

Bard Wall Mount Heat Pumps - 3.0 and 3.5 Ton
Results
Raleigh, NC

Last Updated 05/23/2019 01:50 PM
Project Title

Human Services Sunnybrook Air Handling Unit and VAV Boxes Rejuvenation

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27610   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The general scope is as follows: Replace the HVAC control dampers in AHU-1 and AHU-2. This includes the outdoor air damper, relief dampers, supply air dampers, and mixed air dampers. Replace VFD's on supply fan and return fan in AHU-1 and AHU-2. Install access door in all VAV boxes and clean interior and exterior of boxes. Verify operation of VAV box damper and hot water control valve. Immediately notify engineer if equipment is not functioning properly. All VAV Boxes and air distribution shall be air balanced. Reestablish water treatment in hot and chilled water systems. Treat-rite is current water treatment vendor. Paint and label all pipework in AHU-1 and AHU-2. Upgrade existing Andover DDC control system to Schneider Electric Ecostruxure. Return old controllers to Wake County. Replace all the pneumatic actuators with DDC electronic actuators in the 2 air handling units. Replace DDC control system in both air handling units. Replace the DDC controls in VAV boxes on 3rd Return old controllers to Wake County. Provide new control cable.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents