Similar Projects
Boiler Replacement/ Camp Williams
Alteration
Conception
$444,400 est. value
Camp Douglas, WI

Install Dump Probes and High Water Probes at the Boiler Bldg. 112
Term Contract
Design
Milwaukee, WI 53295

Boiler Services
Term Contract, Alteration
Post-Bid
Milwaukee, WI

Monona Terrace Heat Exchanger Maintenance
Alteration
Post-Bid
Madison, WI 53703

Green Bay Boiler Replacement
Results
$166,000 est. value
Madison, WI

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Business Park Pond and Maintenance
Term Contract
Post-Bid
Stevens Point, WI

Refrigeration System Replacement: Walk-In Cooler
Alteration
Results
Appleton, WI 54911

Mechanical Demolition
Alteration
Post-Bid
Milwaukee, WI

Stairwell Pressurization Van Hise Hall - MEP Bidders - Rebid
Renovation
Results
$1,280,942 CJ est. value
Madison, WI 53715

Furnace Maintenance Services
Term Contract
Post-Bid
Milwaukee, WI

Rosalind Apartments Boiler Replacement Project
Alteration
Results
Fond du Lac, WI 54935

Install Dump Probes and High Water Probes at the Boiler Plant Bldg. 112
Alteration
Post-Bid
Milwaukee, WI 53295

Boiler Replacement
Alteration
Results
Green Bay, WI

2022 Annual Boiler Preventative Maintenance Service
Term Contract
Post-Bid
Madison, WI 53713

Last Updated 05/09/2023 05:04 AM
Project Title

ARPA Traffic Calming projects

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53202   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,385,255 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Liquidated Damages, per diem: $1000/Day Bid security hereinafter specified must be submitted with your bid. If a bid bond is used, it must be sealed by the bonding company and be accompanied by an affidavit of no interest and a copy of a power of attorney. Bonding agents must be licensed to do business in the State of Wisconsin. Bids received after the date and the time above specified will not be opened and read and will be deemed rejected. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works .

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents