Similar Projects
Travers Park Renovations - Phase 1
Renovation, Infrastructure
Design
$7,784,247 CJ est. value
Sandpoint, ID 83864

Cabinet Gorge Hatchery Outdoor Brood Pond
Infrastructure
Design
$300,000 CJ est. value
Clark Fork, ID 83811

Albeni Falls Dam Spillway Gate Recoating and HSS Weld Repair
Infrastructure
Bidding
$25,000,000 CJ est. value
Laclede, ID 83841

Main Post Office Project
New Construction, Infrastructure - 2,432 SF
Bidding
$2,000,000 CJ est. value
Dover, ID 83825

Quilt Block Mastication
Infrastructure
Post-Bid
$100,000 est. value
Sandpoint, ID

Little Sand Creek Discharge Pond Cleaning Services
Infrastructure
Post-Bid
Sandpoint, ID 83864

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Roberson Pines Way Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Sandpoint, ID 83864

Samuelson Avenue Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sandpoint, ID 83864

Water Intake Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Dover, ID 83825

Solid Waste Facilities Improvements Project
New Construction, Infrastructure
Post-Bid
$710,000 CJ est. value
Sandpoint, ID 83864

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Priest Lake White Pine Campground Electrical Upgrades
Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Coolin, ID 83821

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Last Updated 08/22/2022 02:03 AM
Project Title

Grouse Creek Road Relocation

Physical Address View project details and contacts
City, State (County) Sandpoint, ID 83864   (Bonner County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of 2.2 miles of new road and appurtenances on the Sandpoint Ranger District. Work will include surveying alignment, clearing limits, slope stakes and surveying subgrade and final grade, soil erosion and pollution control, cutting and decking timber, clearing and grubbing, embankment and excavation, building turnouts, installation of new culverts, placement of riprap and hydro seeding. Aggregate, Culverts, culvert bedding material and riprap will be obtained from a commercial source. The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents