Similar Projects
HVAC Controller Replacement
Term Contract
Design
Offutt AFB, NE

Wilson Focus Elementary Roof Top Unit Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Omaha, NE 68117

Reheat Superheater Replacement Unit 2 Boiler (Gerald Gentleman Station)
Renovation
Sub-Bidding
$500,000 CJ est. value
Sutherland, NE 69165

Air Filters for Facilities Management (City) and Public Properties (County)
Alteration
Post-Bid
NE

High School Gymnasium HVAC Replacement
Alteration
Post-Bid
Milford, NE 68405

Cooling Tower Repair B451 - Offutt AFB
Term Contract
Results
Offutt AFB, NE

West Cooling Tower Replacement
Alteration
Results
Louisville, NE

North Platte RC HVAC Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
Omaha, NE 68142

Ir Heater Maintenance And Services
Term Contract
Post-Bid
Offutt Air Force Base, NE

Elementary Gymnasium HVAC Replacement
Alteration
Results
Louisville, NE 68037

Masonry Repairs at West Water Treatment Facility
Infrastructure
Sub-Bidding
$150,000 CJ est. value
Ashland, NE 68003

HVAC Upgrades Phase IV
Alteration
Post-Bid
De Witt, NE

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

OPS Chandler View Elementary HVAC Upgrades
Renovation
Sub-Bidding
$900,000 CJ est. value
Bellevue, NE 68147

AV Closet HVAC Central Community College Kearney Center
Alteration
Post-Bid
Kearney, NE 68845

Last Updated 03/27/2023 05:37 PM
Project Title

Sidney Readiness Center HVAC System Repair

Physical Address View project details and contacts
City, State (County) Sidney, NE 69162   (Cheyenne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by this Scope of Work (SOW) consists of furnishing all construction services, labor, equipment, tools, materials, travel, lifts, licenses and permits required to repair the HVAC system at Sidney Readiness Center, Sidney, NE. Work to include removal of existing failing boiler, installation of new VRF system, replacement and repair of failing piping and valves, and necessary interior wall/floor repairs as a result of the HVAC equipment changes. Repair of existing failing HVAC system will be accomplished by replacement HVAC system that will provide new Air to Air VRF system with all new BMS controls as well as exhaust fans. If required, documents can be mailed UPS for an additional payment of $25.00 paid to A&D Technical Supply. Use the place order link in the top right to order bid documents. Questions about obtaining bid documents should be directed to A&D Technical Supply at 402-474-5454 or planroom@ad4lincoln.com Questions or issues about the contents of the project should be directed to Mr. Robert DeMoss (402) 309-8464

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents