Similar Projects
Water Replacement Project
Post-Bid
Less than $1,000,000 est. value
Salem, MA

Install Commercial Water Meters in Brooksby Village
Post-Bid
Less than $95,000 est. value
Peabody, MA 01960

Cross-Peabody Water Transmission Main Contract 1
Results
Less than $3,400,000 est. value
Peabody, MA

Cross-Peabody Water Transmission Main - Contract 2
Results
Less than $5,010,000 est. value
Peabody, MA

Highland Avenue Water Lining
Post-Bid
Less than $600,000 est. value
Salem, MA

Water Distribution System Hydrant Replacements
Results
Less than $30,000 est. value
Saugus, MA 01906

Advanced Metering Infrastructure (AMI) Replacement
Infrastructure
Post-Bid
Ipswich, MA

Water Distribution System Valve Replacements
Results
Less than $30,000 est. value
Saugus, MA 01906

Ductile Iron Pipe
Infrastructure
Post-Bid
Beverly, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 Water Main Improvements
Results
Manchester, MA 01944

Water Meter Testing and Replacements
Results
Less than $45,000 est. value
Saugus, MA 01906

Contract 1- 2020 Water Main Improvements
Results
Less than $2,700,000 est. value
Andover, MA 01810

Brier Neck Water Main Replacement
Results
Less than $1,400,000 est. value
Gloucester, MA

2020 Water Main Improvements
Results
Nahant, MA 01908

Last Updated 09/29/2021 09:18 AM
Project Title

Contract 3B - Water Main Improvements

Physical Address View project details and contacts
City, State (County) Andover, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 3B – Water Main Improvements includes construction of new 12 inch through 4-inch ductile iron water main, including all related gate valves, hydrants, fittings, service connections; and all materials and equipment, services and construction inherent to the Work. The Work (base Bid and Alternate 1 if awarded) for the Project shall be substantially complete within 330 calendar days from the commencement of Contract Time and completed and ready for final payment within 360 calendar days from the commencement of Contract Time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents