Similar Projects
Washington Pike Improvements - City of Knoxville
Alteration
Conception
$15,860,000 est. value
Knoxville, TN 37917

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Coward Mill Widening - Knox County
Infrastructure
Design
$3,100,000 est. value
Knoxville, TN 37931

Kingston Pike Village - Phase 2
New Construction, Infrastructure
Design
$89,000,000 CJ est. value
Farragut, TN 37934

Carter Schools Sidewalk Improvements Knox County
Infrastructure
Bidding
$500,000 CJ est. value
Knoxville, TN 37924

Carter Schools Sidewalk Improvements Knox County
Infrastructure
Bidding
$500,000 CJ est. value
Knoxville, TN 37924

Construction of Water System Improvements for Cruze Road, Stamps Lane, and Broad Acres Subdivision Phase II
Infrastructure
Post-Bid
$490,000 CJ est. value
Knoxville, TN 37902

Traffic Signal System
Infrastructure
Post-Bid
$594,000 CJ est. value
Farragut, TN 37934

GR Upgrade - SR 1024 to Montour Co Line
Infrastructure
Results
$200,000 to $500,000 est. value
Knoxville, TN 37999

Resurfacing on S.R. 131
Infrastructure
Results
$300,000 est. value
Knoxville, TN 37938

Lone Tree Pass
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Knoxville, TN 37902

Lone Tree Pass
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Knoxville, TN 37902

First Baptist Concord Church Educational Building
Addition, Demolition, Infrastructure - 27,900 SF
Pending Verification
$8,000,000 CJ est. value
Farragut, TN 37934

Post Oak Bend
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Knoxville, TN 37922

East Knoxville Greenway - City Of Knoxville
Alteration
Conception
$5,500,000 est. value
Knoxville, TN 37902

Last Updated 10/12/2023 09:34 AM
Project Title

Repair of the Bridge on I-40

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37909   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $298,445 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Knox County No. 47I040-M3-009 (PIN 119729.02) The repair of the bridge on I-40 over U.S. 11E (U.S. 70, S.R. 9, Asheville Highway) (L.M. 25.09). Length - 0.000 miles Completion Time - On or before 3/31/2024 (See Special Provision 108B) Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Headquarters Construction Office (615-741-2414). Information received from other offices of the Tennessee Department of Transportation is strictly advisory A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of ontractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twentyone (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. The Department encourages the use of disadvantaged business enterprises on all contracts. TNDOT - 002 - Repair of the Bridge on I-40

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents