Similar Projects
Last Updated | 02/08/2023 04:18 PM |
Project Title | Lincoln County High School Press Box |
Physical Address | View project details and contacts |
City, State (County) | Stanford, KY 40484 (Lincoln County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed proposals for the following work will be received by Lincoln County Board of Education in the manner and on the date hereinafter specified for the furnishing of all labor, materials, supplies, tools, equipment, services, etc., necessary for the construction of Lincoln County High School Press Box as set forth in the specifications and as shown on the drawings prepared by RossTarrant Architects, Inc., 101 Old Lafayette Avenue, Lexington, Kentucky 40502. Bids will be received from Contractors for a Total Lump Sum Amount. All phases of the work shall be bid to and through the Contractor submitting the proposal. Bid Security in the amount of five (5) percent of each proposal submitted must accompany each Proposal in accordance with the Form of Proposal. No proposal shall be withdrawn for a period of sixty (60) days after the date of bid opening. Right to Reject and Waiver: The Owner reserves the right to accept any bid, to reject any or all bids, to waive any informalities in bids received where such acceptance, rejection, or waiver is considered to be in the best interest of the Owner or to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the Contract Documents. The Owners desire to waive irregularities and informalities as to a bid shall be reviewed and final judgement made by the Kentucky Department of Education, Division of Facilities Management, prior to approval of the contract and financing plan. This project scope includes demolition of the existing press box and the construction of a new wood framed two story press box on concrete footings and stem wall with a slab on grade base. Major building systems are limited to electrical. Solid Ground Project No.: 22-323 Project Site Address: 422 Education Way Stanford, Kentucky 40484 |
||||||||
Details | 2 Stories Above Grade, New Construction, New Construction.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |