Similar Projects
Application of Anti-Fouling Paint to Virginia Marine Police Vessels
Bidding
Newport News, VA

City Hall Painting and Window Repair Project
Post-Bid
Alexandria, VA

First Floor Courthouse Painting
Post-Bid
Buena Vista, VA

Sand Blasting and Painting a Tainter Gate at John W. Flannagan Dam, Haysi, VA
Results
Haysi, VA 24256

Athletic Field Paint for Clearbrook and Sherando Parks
Results
Clear Brook, VA 22624

First Floor Courthouse Painting II
Post-Bid
Roanoke, VA

Painting Service for Northern Regional Office
Results
Richmond, VA 23219

Painting - Southwest Virginia Community College
Post-Bid
Cedar Bluff, VA 24609

Cofer Road Tanks Painting and Improvements
Results
Richmond, VA 23219

A.V. Symington Aquatic Center - Outdoor Pool White Coating
Post-Bid
Leesburg, VA 20176

Traffic Signal Mast Arm and Pole Painting
Results
Staunton, VA

Painting
Term Contract
Post-Bid
Hampton, VA 23669

Bridge Painting Contract
Results
Less than $5,750,000 est. value
Richmond, VA 23219

Painting and Repair Services
Post-Bid
Portsmouth, VA

Fredericksburg District Plumbing Services
Term Contract
Results

Reported 02/08/2020 12:00 AM
Project Title

R/V J.B. Baylor Paint and Repair

Physical Address View project details and contacts
City, State (County) Hudgins, VA 23076   (Mathews County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1) Removal of windlass from bow deck which will not be reinstalled. The hole should be glassed over and prepared for a new stainless steel bitt to be installed in its place with a stainless steel backing plate for reinforcement. (VMRC will provide the bitt and backing plate but these items will be installed by the contractor) 2) Removal of the vessels guard prior to painting and any repairs made to screw hole before bedding and reinstallation after painting is completed. 3) Removal of swim platform from stern, sand and paint with a slight non-skid finish. 4) Removal of all decals and name stickers with only the necessary "name and hailing port" decals to be replaced and provided by the contractor after painting has been completed. 5) Proper cleaning, dewaxing, sanding and fairing should meet the paint manufacturer's specifications.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents