Similar Projects
Five Forks Village Buildings B, C And D
New Construction
Conception
Simpsonville, SC

Section/Corridor Improvements - SC 146 - S-183 (Roper Mountain Rd) to S-654 (Bagwell Rd)
Alteration
Conception
$1,600,000 est. value
Taylors, SC

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Design
$600,000 CJ est. value
Greer, SC 29651

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Design
$600,000 CJ est. value
Greer, SC 29651

Bus Stop Construction and Installations - Phase 2
Infrastructure
Bidding
$100,000 CJ est. value
Greenville, SC 29601

Bus Stop Construction and Installations - Phase 2
Infrastructure
Bidding
$100,000 CJ est. value
Greenville, SC 29601

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

JD Sports #450
Renovation - 4,845 SF
Post-Bid
Greenville, SC 29607

Site Grading at 113 Leesburg Peak
Results
Greer, SC 29651

Safety Improvement at S-279
Infrastructure
Results
SC

The Avant
New Construction
Construction
Greenville, SC 29601

.408 Jackson
New Construction
Construction
Greenville, SC

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Zoo Walkway Repaving - City of Greenville
Alteration
Conception
$366,500 est. value
Greenville, SC 29601

Last Updated 08/01/2022 04:33 PM
Project Title

Bass Pro Shop / Greer

Physical Address View project details and contacts
City, State (County) Greer, SC 29650   (Greenville County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Project Delayed, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be located on a 75-acre site across from BMW Manufacturing. As of August 1, 2022, an application has not been submitted. A firm construction timeline has not been established. *This project timeline has been extended due to the public health crisis. *Bass Pro Shops does not release bid or construction information to the content management team. Interested parties should direct inquires to Bass Pro Shops.

Details

1 Story Above Grade, 120,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents