Similar Projects
City Hall Improvements - City of Philadelphia
Renovation
Conception
$8,000,000 CJ est. value
Philadelphia, PA 19107

Triplex Facilities Improvements Project - City of Philadelphia
Renovation
Conception
$11,944,000 CJ est. value
Philadelphia, PA 19102

Joseph F. Weis Jr. U.S. Courthouse Backfill Project
Renovation - 31,000 SF
Bidding
$10,000,000 CJ est. value
Pittsburgh, PA 15219

Allegheny County Courthouse Courtroom 307A
Renovation
Bidding
$1,173,054 CJ est. value
Pittsburgh, PA 15219

New Municipal Complex
New Construction - 16,560 SF
Post-Bid
$6,000,000 est. value
Sanatoga, PA 19464

Elevator and Stair Tower Addition Wilkes-Barre City Hall
Post-Bid
Wilkes-Barre, PA 18701

Fayette County Courthouse Conference Room Expansion - General Construction
Results
Uniontown, PA 15401

Courthouse 2nd Floor Office Suite Renovation
Renovation
Results
Wilkes-Barre, PA 18711

Franklin County Judicial Center- Administration Building
New Construction - 35,349 SF
Construction
$9,000,000 to $15,000,000 est. value
Chambersburg, PA

Municipal Hall Renovations General Contract Lead Contractor
Renovation - 66,501 SF
Construction
$5,000,000 to $7,500,000 est. value
Norristown, PA 19401

BSS City Hall Reverse Signaling Project
Demolition, New Construction, Infrastructure
Bidding
$7,000,000 CJ est. value
Philadelphia, PA 19107

Construction Services for the James A. Byrne US District Court Clerk's Office Project
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Fairground Exhibit Hall 3 - Design/Build Rehabilitation
Results
Washington, PA 15301

Justice Center Construction Phase 1 - General
New Construction
Construction
Norristown, PA 19401

New Elevator and Fire Alarm System at the Sharon Municipal Building - General Construction
Alteration
Post-Bid
Sharon, PA 16146

Last Updated 08/30/2022 11:07 AM
Project Title

Accessible Toilet Room Renovations at the Frackville Borough Hall

Physical Address View project details and contacts
City, State (County) Frackville, PA 17931   (Schuylkill County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $173,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of a single prime contract. Such construction project can generally be described as: BOROUGH OF FRACKVILLE ACCESSIBLE TOILET ROOM RENOVATIONS CONTRACT NO. 20-1 (Single Prime Contract) Work generally includes: Removal and lawful disposal of existing walls, doors, plumbing fixtures, wall, ceiling and floor finishes and the provision of new walls, doors, plumbing fixtures, wall, ceiling and floor finishes and miscellaneous other items described within the Contract Documents, complete and ready for use and in compliance with the latest codes and regulations. Bidders are hereby notified that this project is subject to the PA Prevailing Wage Rate regulations and Contractors will be required to pay the prevailing wage as indicated within the schedules. Addenda, if any, will be issued only to those persons whose name and address are on record with the Design Professional as having obtained the Contract Documents from the Design Professional. All Bids shall be irrevocable for a period of ninety (90) days after the bid opening date, for the purposes of reviewing the bids and investigating the qualifications of Bidders, prior to awarding the contract. All bids shall be accompanied by a ten (10%) percent bid guaranty, payable to the Borough of Frackville and an acceptable Agreement of Surety. Bid security shall be in one of the following forms only: Certified check (drawn on a bank authorized to conduct business in the Commonwealth of Pennsylvania) or bid bond. Lack of bid guarantee may be cause for rejection of submitted bid. The successful Bidder will be required to furnish a Performance Bond and a Labor & Materials Payment Bond, each in the amount of 100% of the Contract price. A one-year Maintenance Bond shall also be required, for 10% of the final contract amount. The Maintenance Bond shall be required at the project closeout and shall be a part of the project closeout documents. Cost of all bonds is to be included in the Contractor's base bid. The Borough of Frackville is an Equal Opportunity Employer. Bidders must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin, or handicap. The Borough of Frackville reserves the right to reject any or all bids or to waive any technicalities and informalities in the bid for the best interest of the Borough, and to consider the competency and responsibility of the Bidders in awarding the contract.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents