Similar Projects
Santiam Road Overlay: Main Street to Highway 99E - 2442 - City of Albany
Infrastructure
Conception
$956,000 CJ est. value
Albany, OR 97322

Santiam Road Overlay: Main Street to Highway 99E - 2442 - City of Albany
Infrastructure
Conception
$956,000 CJ est. value
Albany, OR 97322

Albany Helping Hands
Addition, Demolition, Build-out, Infrastructure - 1,716 SF
Design
$400,000 CJ est. value
Albany, OR 97322

New Library - City of Harrisburg
New Construction, Infrastructure - 4,307 SF
Design
$1,130,000 CJ est. value
Harrisburg, OR 97446

Albany Train Station Restroom
New Construction, Infrastructure - 276 SF
Bidding
$300,000 CJ est. value
Albany, OR 97321

Decommissioned Water Treatment Plant Site Rehabilitation Project
Infrastructure
Bidding
$1,047,000 CJ est. value
Lebanon, OR 97355

South Shore Elementary School Modular Classroom Relocation - Bid Packages 1 to 4
Renovation, Infrastructure
Post-Bid
$200,000 est. value
Albany, OR 97322

Construction Manager General Contractor (CMGC) - Waterfront Improvements Project
Infrastructure
Post-Bid
$3,000,000 est. value
Albany, OR

Madison Street Bicycle Improvements
Infrastructure
Results
$75,000 est. value
Albany, OR 97322

Henderson Park Playground
New Construction, Infrastructure
Results
$120,000 est. value
Albany, OR 97321

Wiley Creek Assisted Living Facility
Addition, Demolition, New Construction, Infrastructure - 25,650 SF
Construction
$7,000,000 CJ est. value
Sweet Home, OR 97386

Utilizing Factory-Built Buildings to Construction 8 Stand-alone Classroom Building at South Shore Elementary School
New Construction, Infrastructure
Construction
$8,400,000 CJ est. value
Albany, OR 97322

Renovate Childcare Center at Albany Main Campus - 2022 Bond - Linn-Benton Community College
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Albany, OR 97321

Update, Repair Aging Facilities - 2022 Bond - Linn-Benton Community College
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Albany, OR 97321

53rd Avenue Overlay: Chinook Street to Highway 99E - 2443 - City of Albany
Infrastructure
Conception
$844,000 CJ est. value
Albany, OR 97322

Last Updated 10/06/2023 12:10 PM
Project Title

Cheadle Lake Trail Extension

Physical Address View project details and contacts
City, State (County) Lebanon, OR 97355   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 6, 2023 the project was not yet been awarded the timeline for the award was not ye been established Site Directions: 4111 Weirich Drive Trails and/or Multipurpose Trails The major work to be done includes the following approximate quantities: 600 cubic yards of general excavation, 3,680 square yards of Subgrade Geotextile Fabric, 42 lineal feet of 6-inch ADS, N-12, storm culvert, 2,100 tons of base aggregate, 520 tons of HMAC Paving, 120 cubic yards of native embankment and restoration, Erosion Control Devices, and all equipment, materials, and tools to complete the project as identified within the project drawings and specifications. Est. Completion Date: Dec. 1, 2023. All proposals shall be submitted on the prescribed form and in the manner as indicated in the specifications and shall be accompanied by a certified or cashiers check or bid bond in the amount of ten (10) percent of the total amount of the proposal The major work to be done includes the following approximate quantities: 600 cubic yards of general excavation, 3,680 square yards of Subgrade Geotextile Fabric, 42 lineal feet of 6-inch ADS, N-12, storm culvert, 2,100 tons of base aggregate, 520 tons of HMAC Paving, 120 cubic yards of native embankment and restoration, Erosion Control Devices, and all equipment, materials, and tools to complete the project as identified within the project drawings and specifications. The Engineers Estimate is between $275,000.00 and $325,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents