Similar Projects
Ward-Heitmann House Museum Drainage Improvements
Renovation
Bidding
New Haven, Shelton, West Haven, CT 06516

Great Brook Culvert Rehabilitation Project - Phase 1
Bidding
Waterbury, CT

Ductile Iron Pipe
Post-Bid
New Haven, CT 06511

Dale Avenue Drainage Improvements
Post-Bid
Waterbury, CT

Bayview Beach Flood Mitigation Field Court
Results
Milford, CT 06460

Storm Drainage Materials
Term Contract
Results
Wallingford, CT

Storm Drainage Materials
Term Contract
Bidding
Wallingford, CT

Branford Point Seawall and Wharf Repair
Post-Bid
Branford, CT

Beach Nourishment and Erosion Control
Results
New Haven, CT 06510

Removal of Derelict Pipe from Tidal Creek
Post-Bid
Madison, CT 06443

Excavation and Drainage Installation 2020
Term Contract
Results
Middlebury, CT

Kensington Avenue Culvert
Results
Meriden, CT

Guilford High School Practice Field Drainage Improvements
Results
Less than $25,605 est. value
Guilford, CT 06437

Water Pollution Control Facility - Sump and Drainage Installation at WPC Electrical Substation Building
Results
Waterbury, CT 06708

Marie Street Seawall Repair
Results
Milford, CT

Last Updated 09/14/2020 10:35 AM
Project Title

Race Hill Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) Madison, CT   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 08/03/20
Owner View project details and contacts
Architect View project details and contacts
Description

The Work as shown on the Construction Drawings titled “Race Hill Road Drainage Improvements” dated 8-3-2020, includes the installation of approximately 1000 feet of drainage pipe, catch basins, hydrodynamic separator and the construction of a drainage outfall with a performed scour hole as outlet protection. The foregoing is a general description only, and shall not be construed as a complete description of the Work to be performed for the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents