Similar Projects
145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Dodd Boulevard From Highview Avenue to Glasgow Way
Infrastructure
Bidding
$11,669,791 CJ est. value
Rosemount, MN 55068

Dodd Boulevard From Highview Avenue to Glasgow Way
Infrastructure
Bidding
$11,669,791 CJ est. value
Rosemount, MN 55068

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

2021 Crack Sealing and Seal Coating
Results
MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Biscayne Avenue Winery
New Construction, Infrastructure - 8,000 SF
Construction
$4,300,000 CJ est. value
Rosemount, MN 55068

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Last Updated 11/28/2022 12:05 PM
Project Title

Boulder Avenue Extension

Physical Address View project details and contacts
City, State (County) Rosemount, MN 55068   (Dakota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,753,635 [brand] Estimate
Plans Available from Civil Engineer - 09/01/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 4, 2022, the project has been awarded. A timeline for construction has not been confirmed. CITY PROJECT NO. 2022-02 SP 1921-117 TH 3 WSB PROJECT NO. 018351-000 The Project includes the furnishing of all labor and materials for the construction complete inplace, of the following approximate quantities: 22,000 CU YD Excavation - Common & Subgrade 4,400 CU YD Common Embankment 6,200 CU YD Select Granular Embankment 1,900 CU YD Aggregate Base Class V 1,900 TON Type SP 12.5 Wearing Course Mix (2,C) 1,000 TON Type SP 12.5 Non Wear Course Mix (2,C) 1,000 LIN FT 8" - 12" PVC Sanitary Sewer 2,900 LIN FT 15" - 36" RCP Storm Sewer 1,400 LIN FT 6" - 12" DIP Watermain 1,600 LIN FT Pavement Markings The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Rosemount shall comply with the provisions of the statute. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from other sources. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. For all further requirements regarding Bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The intended award date is September 20 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents