Similar Projects
North Troy Air Handling Unit
Design
$250,000 to $500,000 est. value
North Troy, VT

Bugbee Senior Center Heat Pump Systems Phase 2
Post-Bid
Hartford, VT 05001

Champlain Valley Union High School Administration ERU
Post-Bid
Hinesburg, VT 05461

Chamberlin Elementary School Positive Ventilation System
Results
South Burlington, VT 05403

Refractory Replacement for a Bio-mass Chip Boiler
Results
Hyde Park, VT 05655

Plumbing and HVAC Supplies
Term Contract
Post-Bid

Boiler and Pump Replacement
Results
Belvidere, Belvidere Center, VT 05442

HVAC Maintenance at Burlington, VT Weather Forecast Office and Colchester, VT Radar Site
Term Contract
Post-Bid
Colchester, South Burlington, VT 05403

Heat Pump Installation at Green Mountain Technology and Career Center
Results
Hyde Park, VT 05655

HVAC Services and Preventative Maintenance Agreement for the Colchester Police Station
Alteration
Post-Bid
Colchester, VT

Replacement of Community Building Boiler
Alteration
Results
East Haven, VT 05837

Ventilation System Upgrades for County Court Houses
Term Contract
Post-Bid

Emergency Medical Service Station Retrofit Attic Air Seal and Insulation System
Alteration
Results
Barre, Websterville, VT 05641

Commercial Heating and Air Handling Services
Alteration
Post-Bid
Rutland, VT

Environmental Depot HVAC Scope
Alteration
Results
$20,000 est. value
South Burlington, VT 05403

Last Updated 08/25/2022 04:10 PM
Project Title

BGS - Waterbury Chiller Compressor Replacement

Physical Address View project details and contacts
City, State (County) Waterbury, VT 05676   (Washington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Due to security reasons, please contact Reprographer to obtain bid documents This project consists of, but is not limited to, all labor, material and equipment to complete the following: 1. Background: The complex has two (2) Multistack Water-Cooled, MagLev(TM) Chillers that were installed as part of the rebuilding of the complex after hurricane Irene in 2016. The chillers have a capacity of 325 tons with Evaporator: EWT 57F, LWT 42F @ 520 GPM; Condenser EWT 85F and LWT 95F @ 920 GPM. During start up this spring, 3 of the 4 compressors were deemed to be non-functional. 2. Replace the Danfoss Turbocor model TTS400 and TT500 compressors with TTS400 and TTS700 compressors, one (1) each per chiller, total of four (4) compressors. Compressors are 480 Volt, 3 phase. 3. Recover existing R134A refrigerant for reuse after replacing compressors. 4. Provide programming updates for replacing the TT500 compressors with the new TTS700 compressors. 5. Perform a vacuum pull down below 500 microns, and nitrogen purge, at least twice, followed by a vacuum pull down below 500 microns and weigh-in charge of recovered refrigerant. 6. Add new R134A refrigerant as needed to provide a full charge, include price per pound installed on the bid proposal. 7. Provide new hard drives and factory programming and start-up by a factory trained and authorized technician. 8. Work will commence on Chiller Number 2, when Chiller Number 2 is fully operation and in service, work may commence on Chiller Number 1. There will not be a pre -bid meeting for this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents